Australia Free Web Directory

J carpentry in Melbourne, Victoria, Australia | Carpenter



Click/Tap
to load big map

J carpentry

Locality: Melbourne, Victoria, Australia

Phone: +61 417 144 054



Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 Floor pozi done on 2 units in less then 4 hours, packed, booted and braced. Good team effort.



25.01.2022 We have finished for this year. This is the last one for this year.

24.01.2022 Heres some ceder boards installed, bulkheads and walls built.

24.01.2022 Now starting the external lock up, timber fascia, eaves, battening for matrixs and cladding. ( part 1 )



23.01.2022 Walls and shaft liner are up on a 3 unit site now just waiting for steel and bricklayer

23.01.2022 Another frame finished this year

23.01.2022 Floor pozi going up on a mansion of a job



23.01.2022 Heres a lockup I just finished

22.01.2022 Shades are up job completed

22.01.2022 Another job finished

21.01.2022 Here’s a canopy framed up with a box gutter in it with sumps. Framed up and ready for eave sheets.

20.01.2022 Heres a few pictures of jobs we have finished



20.01.2022 Here’s some photos of a lock up, a fence built and landscaping done this week. We also do renovations.

20.01.2022 Here some photos of a lock up were doing at the moment. Just need bricklayer and roofer to finish so we can finish.

19.01.2022 Another frame done and dusted

19.01.2022 Walls are up and waiting on trusses

18.01.2022 Another set of walls done and waiting for roof

18.01.2022 Walls are up now waiting for roof trusses

17.01.2022 1 set of ground floor walls up now waiting for steel guys and bricklayers before we can do the 2 set of walls.

17.01.2022 Heres a 5 unit site were doing. Single story finished and ground floor done on the 4 town houses.

17.01.2022 Here some photos of a 5 unit site doors hung and staircase walls built and a single story fix.

17.01.2022 Messmate table with black powder coated legs with a resin coat

16.01.2022 From the J Carpentry team we would like to wish everyone a merry Christmas and a safe new year.

15.01.2022 Here are some more pictures of the weatherboard job we done this week.

13.01.2022 Lining boards we did on a factory but they wanted to keep the roof trusses showing.

12.01.2022 All the walls are up now waiting for roof trusses.

12.01.2022 Another 3 townhouse site, ground walls up now waiting on bricklayer and steel mob.

12.01.2022 Heres a canopy framed up with a box gutter in it with sumps. Framed up and ready for eave sheets.

10.01.2022 Walls built and decked with door. Including love seat with storage. Another happy customer! Contact me for any renovation and carpentry needs

09.01.2022 Heres a 3 unit site that we finished this week

08.01.2022 Walls are up that we could do for now, just waiting on steel and bricklayers.

07.01.2022 Heres some photos of a lock up, a fence built and landscaping done this week. We also do renovations.

07.01.2022 Ground floor walls are up on a 3 unit site waiting for bricklayers and then steel guys, then floor pozi.

05.01.2022 Walls are all up and single story roof pitch, shaft liner up, now we wait for roof.

05.01.2022 External lock up (part 2) of childcare centre

04.01.2022 Another set of walls done, now we wait for steel work.

03.01.2022 Here’s some ceder boards installed, bulkheads and walls built.

02.01.2022 Internal lock up done now to attack the outside

02.01.2022 All beams and balcony joists are up now waiting for floor pozi.

02.01.2022 More pictures of the 16 town house site were working on.

02.01.2022 Heres a 3 unit site were doing the landscaping for. Decking, fencing and fake grass.

Related searches