23.01.2022 Day 3/4/5 - finished laying and grouting floor and wall tiles. Just a little plastering to complete work.....



23.01.2022 Day 2 of Tiling.. some floor and wall tiles laid.

23.01.2022 A couple of big weeks with rental property renovations, tiling, laundry rebuilding and trying to complete two oiling deck jobs but the weather has not been kind. We need a dry 24 hours after oiling to ensure no water staining on the decking boards. Two jobs now lag over till May.

22.01.2022 Well the last month has been about oil maintenance for several of our clients and a couple of new clients.



21.01.2022 Finished front deck at The Peak...

20.01.2022 Well again its been awhile between posts.... sorry. Lets start from the most recent week, this week. Finished painting the outside of a rendered house including the gutters and trimming a few trees Panel door to be done at a later date.

18.01.2022 End of week one decking; using Shark Tooth hidden deck fasteners, also setting up, framing boards, facias and chatting to the various tradesmen onsite....



11.01.2022 Starting the deck in Cairns using Shark Tooth hidden deck fasteners

10.01.2022 A long week decking and waiting for downpipes to be installed allowing continuance on pool deck. Railway line is down - now waiting for the Quad day bed......

10.01.2022 After a few days, finished the Terrace Deck...

05.01.2022 The decks and various landings are complete at The Peak

01.01.2022 In the previous three weeks, we have been maintaining body corporate and residential properties at New farm, Fig Tree Pocket and Parkinson doing various things like: paving, installing access path ways, drainage, installing storage cupboards, painting carpark lines, painting boundry fences, installing aluminium screens, gutter repairs, kitchen cupboard repairs, decking sanding and oiling. Its been a busy 5 weeks. We stepped into the Apartment complex at Southbank to reso...lve a few small maintenance issues and preparing to paint a couple of bathrooms. Well we're off to fly back home for a deserved 4 day break.