Australia Free Web Directory

Kennedy electrical | Home improvement



Click/Tap
to load big map

Kennedy electrical

Phone: +61 411 565 120



Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 Saturday night breakdown on a ride at Oktoberfest, ride operational, now a free beer and complementary feed in the VIP section courtesy of the owner!!



25.01.2022 Installation of a brace saw for a customer. Wired, tested and commissioned.

21.01.2022 We are sponsoring my local cricket team this season, back to tradition white. Let's hope it's a great season with some good cricket thrown in for measure!!

19.01.2022 Thank you to North Lakes Signs for the vehicle advertising signage. Catches the eye, simple but effective.



19.01.2022 Must needed upgrade of a switchboard for a piece of equipment. Believe it or this switch board was secured with a couple of rags joined together!!

19.01.2022 Small job for a piece of process machinery.

18.01.2022 400 Amp mains and 250 Amp sub main at Narangba. Wiring of 2 new industrial sheds.



17.01.2022 Build of a 22 KW soft starter box for a Ventilation/extraction system. Worked out approximately 35% cheaper than buying one from a manufacture.

17.01.2022 400 KVaR power factor correction unit, planned and installed in a heavy industrial site back in June 2016. Results have shown a saving of $2500.00 a month, $30,000.00 a year on energy prices.

16.01.2022 New/upgrade to a section of a log rounding machine. Fully installed, programmed, tested and commissioned.

16.01.2022 Please,please, anyone who reads this make sure your smoke alarms are working. Press the test button and hold it till it alarms. A battery is worth a lot less than a life.

14.01.2022 The cooler nights are upon us in Brisbane, as you turn the heaters on and electric blankets please keep in mind the last time you tested your smoke alarms. Keep safe this winter.



13.01.2022 Small control board wired for Milfab fabrication @ Narangba

11.01.2022 Installed a mid sized compressor today, decided to tidy up some cables. Before and after.

09.01.2022 Stages of small control board production.

07.01.2022 Hopefully have engaged a new customer today, a CNC wood saw had failed. Contacted via SJO maintenance for urgent repair. Found a fault on the emergency stop control circuit, customer happy his saw is running again. The rewards of his reaction is why I enjoy what I do.

07.01.2022 Installed a new distribution board and 3 phase outlets for an industrial customer, We here at Kennedy Electrical can assist with any electrical installation from planning to design through to installation and commissioning.

07.01.2022 Cold room installation, lighting, power and mains board for refrigeration @ Steritec, Narangba.

06.01.2022 Hello Queensland, as we finally get into the cooler nights after Autumn seemed like summer. Just a reminder to get a chair out or a broom handle and test your s...moke alarms. Everyone turning on heaters and electric blankets please make sure you give yourself every chance if there is a fire. Be safe See more

06.01.2022 Complete fit out and mains upgrade of a medium sized industrial unit. Twelve machines and auxiliary equipment wired and commissioned. New mains distribution board and LED lights installed.

05.01.2022 80-200 AMP mains upgrade to allow for production area and office space expansion at a small production company. Including new main switch board and metering, new sub distribution board. Last picture is the existing mains board.

04.01.2022 We are sponsoring my local cricket team this season, back to tradition white. Lets hope its a great season with some good cricket thrown in for measure!!

04.01.2022 Mains upgrade at a local manufacturer, preparation for 2 new large CNC machine installation. 80 AMPs per phase upgraded to 250 AMPs per phase with full metering.

04.01.2022 Installation of a 400 AMP distribution board at a large industrial site, Narangba. We then used this to feed a hazardous area mixing machine.

03.01.2022 Upgraded the vacuum pumps on two of these robotic arms this weekend. Fascinating pieces of equipment and programming required to stack pallets.

02.01.2022 New stainless steel ceiling fan and LED lighting installation.

Related searches