24.01.2022 A big day today but we got it done! Replacing a warped, scorched and shrunken section of 300 dwv along with installing insulated steel ductwork to prevent the same happening again from the hot tromel underneath.
24.01.2022 Nice little job this morning clearing and leveling and removing old cyclone fencing and posts left behind by another contractor.
24.01.2022 Been a busy week for us with anchor trenching works and a passive gas system installation at Wangaratta and Bendigo for Winslow Constructions.
20.01.2022 Another solid week welding ground water drainage lines as a part of the construction of a new landfill cell in Ballarat for Goldsmith Constructions.
20.01.2022 Something a little bit different this weekend, a site cut and fill with a driveway cut in.
19.01.2022 The boys have been hard at it this week butt welding poly pipe strings for a leachate collection system installation we are undertaking for Goldsmith Earthmoving in a landfill cell construction project.
15.01.2022 Here is a recently completed discharge/recirculation and transfer system we’ve completed. Whilst it’s been challenging today was a great result to see it commissioned, along with a happy customer
15.01.2022 Another week closer to the Christmas Break and we have just completed another substantial placement of buffer sand placement for our valued client at one of their Victorian landfill sites.
14.01.2022 Despite the rain and mud we pressed on and drilled landfill gas wells today as part of a landfill rehabilitation project we are involved with. Not looking forward to cleaning up the machines though!
13.01.2022 Today we took delivery of our new float trailer guaranteed to make it more efficient to transport machinery between job sites
12.01.2022 Got my first taste of floating the digger today, pretty excited!
11.01.2022 The last piece of our scope of works for Shamrock Civil on their Seymour Landfill Cell construction, supply and installation of a 6 inch Airwell pump ready for commissioning once air and leachate lines are ran.
07.01.2022 Some of the work we commenced this week in Wangaratta, we’ve begun installing a passive gas system as part Winslow Constructions landfill rehabilitation project. Still a work in progress with the installation of a landfill extraction system to commence in the coming weeks.
02.01.2022 Quite a long day today assembling, installing and commissioning an 8 inch Airwell Pump into a landfill leachate sump, along with 150 mtrs of trenched air and leachate lines.
02.01.2022 One of this weeks jobs was buttwelding a 560mm ground water riser for a landfill cell under construction.
02.01.2022 Got to take the trailer for its maiden voyage today, unfortunately it was only to buy some new tracks for the posi after snapping one yesterday.
24.12.2021 Variety is the spice of life so the saying goes. A waster water system valve removal and new installation for Max Bright at Westen Water, Melton and new tank connections for Goldsmith Construction at Hanson, Wollert.
18.12.2021 Rock, rock and more rock!
15.12.2021 Day 1 of many more to come done and dusted re sizing rock for Max Bright at Westen Water Mt Cotterell.
06.12.2021 This week we made the most of the good weather and headed to Ballarat welding up pipes for a leachate collection system for Goldsmith Construction.
28.11.2021 We’ve just completed the supply and installation of this landfill leachate collection system for our valued client Shamrock Civil. The weather gods shone on us helping to get it completed in 3 days.
10.11.2021 One of the weeks projects. Excavation work at Porter Groups yard in Dandenong. We removed the old hard stand which had become clogged with dirt, prepping the sub grade then layed down and compacted in new rock. Thanks to Brad Vanette Handley from B&R Handley Contracting for the assistance with this one.
23.10.2021 This week we got to put our new grab to work demoing site sheds and an old work shop for one of our long term customers. Needless to say the grab made light work of the job.
21.10.2021 Today we were lucky enough to take delivery of our first brand new excavator. With the addition of a tilt hitch and additional safety features hopefully this opens the doors to bigger and better projects.
15.10.2021 This week we travelled back to Wangaratta to complete the final stage of our landfill gas extraction system. Whilst the weather was against us we pushed through and installed the main gas header line, gas flow lines and relocated a portable flare.
13.10.2021 This week we headed to Horsham for Shamrock Civil to supply and install a leachate collection system and sump.
01.10.2021 With the help of Brad Vanette Handley from Next Level Drainage and Excavation we turned this muddy space into a hardstand area which will house an ice pigging plant for Suez Water.
Related searches
- Duo Fitness
Businesses Sport & recreation Fitness boot camp Fitness trainer Sport & fitness instruction
+61 421 337 266
57 likes
- Commercial Kitchen Management
Businesses Local service Business service Hospitality service
+61 422 388 872
99 likes
- AAA Carpentry & Joinery
Businesses Local service Home improvement Construction company Carpenter
+61 413 942 537
33 likes