Australia Free Web Directory

Knoxout Traffic | Local business



Click/Tap
to load big map

Knoxout Traffic

Phone: +61 423 901 319



Reviews

Add review



Tags

Click/Tap
to load big map

21.01.2022 The Ute that got stolen and burnt out It was a good little Ute. However, this setback won’t slow us down.



21.01.2022 Merge taper on a 100km road, into a lateral shift taper to help slow the traffic down past the work area

21.01.2022 Knoxout Traffic is now recognised by the ACT Government as having high ethical and labour standards

20.01.2022 Long term traffic management plan installation on 3.2m gal posts.



16.01.2022 Lane closure on Parksway. Cones were used for the merge taper and bollards were used to delineate the work area.

16.01.2022 Fully packed ready for work

15.01.2022 Traffic controllers wanted! Looking for two qualified traffic controllers for ongoing work in Canberra and surrounding areas. Casual positions available. Feel free to message or call to find out more details.



14.01.2022 Merge taper on a 80km multi-lane divided road.

14.01.2022 The Ranger is all setup with a sign rack now!

14.01.2022 New Ute! Can’t wait to get it setup properly with a sign rack.

13.01.2022 One of our team leaders came up with this creative idea to position signs above guard rail on the Barton HWY

10.01.2022 The XR8 hits the worksite! Easily the fastest traffic control ute in Canberra, possibly Australia. It’s not finished yet though! Since it still has to have the LED flashing light hard wired and a sign rack installed, with an innovative twist. Follow Knoxout Traffic’s posts for a build thread



10.01.2022 The ute that was stolen and burnt has had its engine removed and put into another ute.

10.01.2022 Looking for two qualified traffic controllers for casual work in the Canberra region. Having your own radio and PPE is preferable.

09.01.2022 We had a productive morning out in the city

09.01.2022 A successful Morning of traffic control in one of Canberra’s most iconic locations, with the Traffic Management Plan designed and implemented by Knoxout Traffic

08.01.2022 Long-term sign installation. Plan designed and implemented by Knoxout Traffic

05.01.2022 Another Ute. Can’t wait to get it setup for the work site

04.01.2022 Had a great time working yesterday on the Colour Frenzy fun run. There was lots of happy colourful people.

04.01.2022 Welding up another sign rack

02.01.2022 Another good day of work in the scenic Upper Lachlan shire

Related searches