Australia Free Web Directory

KWIK KERB continuous concrete garden edging | Gardener



Click/Tap
to load big map

KWIK KERB continuous concrete garden edging

Phone: +61 408 888 964



Reviews

Add review



Tags

Click/Tap
to load big map

24.01.2022 We started this garden in 2015. We had a few trees that were the start of the canopy, giving us shade for the new plants. Concrete pathways are laid before starting on the gardens. The garden was built up with soil before planting. Lawned area was also built up with soil before laying the lawn. finished with a good thick layer of sugarcane mulch.



22.01.2022 This garden kerbing was done in a more formal design to complement the fence with straight lines and corners making it very eye catching.

20.01.2022 Plain concrete continuous kerbing. Customer was very happy with the end result.

19.01.2022 Needing a new garden bed but the grass is to hard to remove? We have a turf cutter which we use to cut the grass to create a new garden bed.



11.01.2022 With the continuous garden edging we are able to create curves for any garden.

06.01.2022 Garden 3 years later, The garden now gives the home shade and also help keep your home cool.Now we have lovely gardens to relax in and enjoy. Lawn is thick and lush from been only mulch mowed. Mulch mowing helps keep the lawn healthy by mulching every time you mow and as the mulch breaks down it also feeds your lawn and helps keep in the moist.

04.01.2022 We can help you with your next garden bed. We have a turf cutter which we use to create new garden beds.



04.01.2022 Coloured continuous garden kerbing. Client choice a black to complement his home and garden. Client was happy with the job. His garden looks fantastic.

02.01.2022 With summer fast approach in it is time to prepare your gardens to cope with the heat. We recommend to redress the garden with fresh soil and then put a thick layer of sugarcane mulch. Don't forget to give your garde a good water before you mulch then water the mulch down so it trap the moisture in and won't blow away.

01.01.2022 Before and after photos of plain concrete continuous kerbing repair. This is kerbing that was done and the next day was run over by a car. After cutting out the damaged kerbing and repairing it.

Related searches