25.01.2022 Malvern east extension. Slab steel down hydronic heating coils installed ready for the pour of this polished slab on Monday



25.01.2022 Change rooms and counter for a uniform shop just days away from opening

24.01.2022 Mt evelyn extension. Nice day to strip roof off and reroof thanks to the boys at sheet hot roofing for a big day

24.01.2022 East Malvern extension. Back half of the house gone ready for plumbers to start doing the drainage



23.01.2022 Malvern east extension. Getting everything ready for some demo works to be underway Tomorrow. Not the nicest looking house on the street (yet) by any means

23.01.2022 East Malvern extension. Scaffolding been finished off framing will be completed by the end of the week ready for roof early next week

17.01.2022 Frankston shop make good for end of lease



17.01.2022 Glen Waverley renovations. Just completed handover clients are very happy to move into their newly renovated home

15.01.2022 Merry Christmas from all of us at linley homes we look forward to 2019 with many jobs already in the pipeline

12.01.2022 Mt evelyn extension. Front portico framed up ready for the old tiles to come off and new tin to go down later next week

11.01.2022 Bayswater homes. Driveway in one and the other underway. Fencing just about completed landscaping will be finished of Monday

10.01.2022 Ferntree Gully. Nice day out in the sun to start framing



09.01.2022 Glen Waverley reno. Carpets in just got splash back and mirrored robe doors to go before we hand back to the owners

09.01.2022 Mt evelyn extension been a big couple of weeks getting this extension locked up. Insulation in and plastering well underway

07.01.2022 Ferntree gully sub division. Plumbing below ground completed concrete down and termite barriers installed walls should be going up in the next couple of weeks

07.01.2022 East Malvern. Steel been installed ready for some wall framing

07.01.2022 Something a little different for us this week doing some landscaping for a previous client come up well and all finished before the rains

06.01.2022 Mt evelyn extension. Painting just about completed, staircase went in today ready for a sand and polish

04.01.2022 Glen Waverley renovation. Flooring getting sanded tiling completed kitchens just about done.

04.01.2022 What a change 24 hours can make from this old pet shop to a uniform shop just needs some paint and carpets

01.01.2022 East Malvern. Concrete done ready for its first grind next week