Australia Free Web Directory

M2E Services | Businesses



Click/Tap
to load big map

M2E Services

Phone: +61 7 4952 4842



Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 M2E Services Projects Update Braeside Pump Station Upgrade - Ongoing Dragline 27 Pit stop En-route to South Walker Creek - Ongoing ROM Availability Upgrade Project (PDM Mine) - Ongoing Collinsville Coal Infrastructure Upgrade projects - Ongoing



22.01.2022 M2E Services is currently in NSW at Ulan Coal Mine completing a 8050 Dragline Upgrade.

20.01.2022 Completion of Train Loadout Upgrade at Peak Downs Mine.

18.01.2022 M2E Services has recently been awarded a Minor & Major Dragline shutdown. Please email Resume to [email protected]



18.01.2022 M2E Services is currently completing a 1370 Dragline upgrade/rewire at Peak Downs Mine

17.01.2022 Tarong 1370 June 2011 - August 2011

17.01.2022 Dragline 25 Shutdown Client: BMA Blackwater Mine Scope: HV & Control System Upgrade’s, Motor replacements, Slip Rings & Lightning Arrestors Overhaul, Planetary Drive Upgrade, drawing red pen mark- ... ups and commissioning. Duration: 3 months See more



17.01.2022 Today is the end of an era as John Moulds announed he will be retiring from work. Amoungst his peers "Mouldsy" has no equal as a dragline electrician, he has m...entored many tradesmen and sorted out one or two superindants that needed it John started as an apprentice at Mt Morgan in 1969, he has been an active union menber all his craeer, a business owner and worked for a number of companies in the CQ area. On behalf of all at M2E Services we wish John and Linda all the best for the future in retirement. See more

15.01.2022 Blast Compound Client: BMA Peak Downs Mine Scope: Engineering design, procurement and installation of lighting towers and blast compound equipment.... Duration: 8 Months See more

15.01.2022 Dragline 26 Client: BMA Blackwater Mine Scope: HV & Control System Upgrade’s, Motor replacements, Slip Rings & Lightning Arrestors Overhaul, Planetary Drive Upgrade, drawing red ... pen mark-ups and commissioning. Duration: 3 Months See more

15.01.2022 Merry Christmas to you all! Keep safe through the holidays.

14.01.2022 DRE42 Construction Jan 2010 - March 2011



13.01.2022 M2E Services WA Division A big well done to Gary Burton and the Electrical team that has recently completed a number of drill rig automation projects for Flanders Inc. Although the conditions and work rosters were sometimes tough the team manage to complete the projects safely and on time. https://www.flandersinc.com/products-i/flanders-products//

11.01.2022 Completed DL301 Shutdown, Well done to all involved

10.01.2022 Caval Ridge Shovel currently walking to Pit... Well done Northern division..

09.01.2022 M2E Services is currently seeking expressions of interest for upcoming work throughout the Bowen Basin region

08.01.2022 M2E Services Project Status Dragline 42 Major Shutdown Complete

08.01.2022 Saraji MCC 1A,1B & 3A,3B 4 x CHPP MCCs, 1 x Field MCC 110 Drives 14 Days... Delivered Safely, On Time and On Budget. Well done to all involved with this project, by far the hardest project we have ever completed in that time frame.

07.01.2022 Saraji MCC 1A,1B & 3A,3B 4 x CHPP MCC's, 1 x Field MCC 110 Drives 14 Days... Delivered Safely, On Time and On Budget. Well done to all involved with this project, by far the hardest project we have ever completed in that time frame.

06.01.2022 Dragline 25 Shutdown Client: BMA Blackwater Mine Scope: HV & Control System Upgrades, Motor replacements, Slip Rings & Lightning Arrestors Overhaul, Planetary Drive Upgrade, drawing red pen mark- ... ups and commissioning. Duration: 3 months See more

06.01.2022 M2E Services completes second Electric Rope Shovel for Hastings Deering at Daunia Mine. Another great effort from the Northern division.

05.01.2022 Dragline 27 Upgrade Client: BMA/BMC, Goonyella & South Walker Creek Mine Scope: Control system upgrade of 8050 dragline, full rewire, installation of new MCC, HV equipment, installation of new field I/O panels, drawing red ... pen mark-ups and commissioning. Duration: 7 Months (Across multiple remote sites) See more

05.01.2022 Dragline 22 Shutdown Client: BMA Saraji Mine Scope: Fan MCC upgrade, Motor & Generator replacements, Slip Rings & Lightning Arrestors Overhaul, drawing red pen mark-ups and commissioning. Duration: 3 Months

04.01.2022 Dragline 26 Client: BMA Blackwater Mine Scope: HV & Control System Upgrades, Motor replacements, Slip Rings & Lightning Arrestors Overhaul, Planetary Drive Upgrade, drawing red ... pen mark-ups and commissioning. Duration: 3 Months See more

04.01.2022 Abbot Point Terminal X-50 Upgrade November 2010 - 2011

01.01.2022 Dec 2010 - Oct 2011

Related searches