24.01.2022 Just took Delivery of our new Scheuerle Self Propelled Modular Trailers SPMT,, 2x10 line



22.01.2022 Another 5 x 50t beams Great work From Doolans Team

21.01.2022 Main Gear Box with all its motors now attached, 450 ton Plus 15 line and SPT 520 ton Chappo Dave Chapman Jason Ormerod... Ben Ashcroft Robby See more

19.01.2022 5 nights 35 x 55ton Super T Beams Well done everyone and Doolans Heavy Haulage Metcalf Cranes



17.01.2022 Second Ball Mill in place 180t... GREAT WORK GUYS,, All packed up 7 Trailer loads of gear,, Time for home

17.01.2022 Another 4 x 35m Long 65ton T Beams loaded For Doolans Great team effort,

15.01.2022 400 tonne cutter head lifted and shifted down on the West Gate Tunnel Project.



14.01.2022 From everyone at Machinery Movers Sincere condolences to MRA and Dannos Family .. RIP. Fella.

14.01.2022 Second SPT ( self propelled trailer ) delivered today to the North portal of the west gate tunnel project, ready to lift and shift some heavy sections of the TBM vida for assembly!

14.01.2022 Great effort this morning 400 ton cutter Head Split the 15 line and make two 12 lines side by side SPT Chappo Dave Chapman Jason Ormerod... Ben Ashcroft Robbie Johnston See more

12.01.2022 260 tonne tunnel boring machine module on the move with self propelled trailers

10.01.2022 Joint effort with Doolans Heavy Haulage moving a 260 tonne tunnel boring machine module with 4 6 axle self propelled trailers



09.01.2022 https://youtu.be/XQPMQFPSFdg

08.01.2022 https://youtu.be/7-igzFvrjGU

08.01.2022 The guys got their utes Good things come to those who work hard and wait

07.01.2022 Discharging the ship of the segments for the second tunnel boring machine

07.01.2022 Completing a test lift before tomorrows install

06.01.2022 The guys made this for me,!!! So I can remember how to drive lol Thanks Ben/Jase

05.01.2022 Big thanks to the Mac Movers Crew And Robert Johnson Bailey 170t Ball Mills on site now, Ready for installation next week

04.01.2022 Fantastic Team effort Doolans and Machinery Movers.. Delivery of the second Cutter Head 400ton Well done guys

04.01.2022 Removal and replacing a 180 tonne zinc pot 3 storeys underground

04.01.2022 Relocating a reach stacker mast to its new depot

03.01.2022 Hi guys,, Mac Movers are chasing a rigger for 1 to 2weeks work possibly on going Fork MC road ranger Tickets advantage... Call Dave 0400 844 263 See more

02.01.2022 400 tonne cutter head in position for now down on the West Gate Tunnel Project

02.01.2022 Loading up Super T beams with the 100t mobile gantry 6 x 50t T beams 6 more in the morning