Australia Free Web Directory

Maxibor Australia | Local business



Click/Tap
to load big map

Maxibor Australia

Phone: +61 2 4966 5583



Address: Unit 7a, 26 Balook Drive Beresfield 2322

Website: http://www.maxibor.com.au

Likes: 206

Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 Maxibor is again in the press https://indd.adobe.com//2fc2d233-03f6-46dd-b5e1-1d2a3119e1



23.01.2022 https://www.trenchless-australasia.com//december-edition-/ Scotts Head happy ending now in print - see pages 5 and 46-47

23.01.2022 A happy Maxibor team with Comdain friends. A big job boys - 335m of 800mm pipe safely 30m under the Swansea Channel.

21.01.2022 The sign says it all - Maxibor scoring 100% - Rodney and Dave having fun at Mt Pleasant.



19.01.2022 Check out Dave Turner of Maxibor, the star of the Qenos video showing the world first install of environmentally friendly and long lasting water pipe manufactured with their resin in Australia https://youtu.be/gVFjOJ-HSi0

18.01.2022 335m of 800mm pipe disappearing under the Swansea Channel - spot the drone. Well done Maxibor

16.01.2022 Maxibor rescues joey during bushfires in Queensland. The Maxibor team on the Greenbank to Flagstone Trunk Wastewater Pipeline rescued an orphaned joey found on the side of the road at South Maclean, Queensland during the bushfires. Rodney took the joey from its mother’s pouch and contacted Wildcare Australia, with the joey now safely in the hands of the rescue organisation.... At a recent award event Rodney was recognised by Logan Water Infrastructure Alliance for his caring actions along with Maxibor and other staff for outstanding performances around environment (saving water), community (engaging local businesses), leadership - James Hand(difficult bores) and workplace mental health - Tyler Farmer (being happy). These socially responsible actions provide just some of the demonstrated evidence that Maxibor is delivering outcomes that help build a future we all look forward to.



16.01.2022 Maxibor at work on the NBN A river-deep detour: connecting coastal village Scotts Head https://www1.nbnco.com.au//a-river-deep-detour-connecting-

11.01.2022 Maxibor today successfully completed the install of a 1.320 kilometre 500mm waste water pipeline for Logan City Council. What a great job by Rodney and the Maxibor team. This is one of the longest bores completed in Australia and demonstrates the capabilities and skills of Maxibor and how horizontal directional drilling can be good for the environment in the short and long term. The bore hole was drilled to a diameter of 650mm and the very long pipe was pulled through in just a few days. The ground conditions were mostly rock which tests show was at a confined strength of over 60 MPa (that's quite hard rock!)

10.01.2022 Maxibor was proud to be part of the Brisbane Irish SEQLD Drought Run yesterday. Over $70,000 raised with water and other suppliers being transported to farmers in desperate need.

07.01.2022 335m of pipe safely installed under the Swansea Channel.

07.01.2022 To each and every one of our valued Clients, Suppliers and Delivery Partners thank you for a fantastic 2017. We wish you a successful and safe 2018 as we build a future we all look forward to.



Related searches