25.01.2022 Mayneside's newest design Another new one coming soon
24.01.2022 Lots 99 & 100 Wakeboard Crt Nearing completion 4 weeks and they'll be ready too
24.01.2022 Banfield dr Tiling under way Kitchen being installed Nearly ready For painting end of next week
23.01.2022 Happy New Year 2017 up and away First roof for The year Lot 73 Wakebaord Great $$$$value only 1 neighbour
23.01.2022 Using a bobcat to pour the driveway to steep for the trucks
22.01.2022 Windows are in at Banfield Dr Wall frames today
22.01.2022 Banfield Dr all framed up Rough in and pre wire completed Gyprock sheets being installed today
22.01.2022 Lot 100 Wakeboard slab in Lot 99 tomorrow
21.01.2022 Hi Mayneside Facebook friends We've been busy 7 built all but 1 left Don't miss out on the fantastic deals on offer New house designs on the way 8 new houses ready to start in 4 weeks ... What a Christmas present A Brand New 4 bedroom plus Media for under $400000.00 If your quick you can select your own colour scheme, fixtures and fittings Be quick or miss out By from Bingen See more
21.01.2022 Driveway Lot 71 Wakeboard
20.01.2022 Banfield dr Starting external paint works today
20.01.2022 Lot 18 No 93 Banfield Dr Just plants and the letter box to go
20.01.2022 Roof sheeting Lot 18 Banfield dr
19.01.2022 Lot 65 Wakeboard Crt Ross River Estate Brand new design never built before in Townsville Construction to start October 2017 Plenty of time to buy and work with our team on colours etc
19.01.2022 Might have to close the office windows today a little windy
19.01.2022 China St house lift and cyclone up grade underway Demolition underway
18.01.2022 No 4 Kayak Ct is finished ready to move into First of the year 2017
16.01.2022 China St is finished Fencing complete
16.01.2022 Suppliers and Subbies on site this morning
16.01.2022 2 houses sold and new owners have moved in One more under contract Only 3 ready to Move into house left Come meet your new neighbours
16.01.2022 Banfield Dr Slab is in
15.01.2022 Fascia and gutter Roof battens Roof sheets tomorrow
14.01.2022 Last slab for the year 2016 Merry Christmas everyone
14.01.2022 Big week ready for roofs at Lot 93&94 Wakeboard Block work on lot 95 Wakeboard 2 more under way lots 99 & 100 Wakeboard
14.01.2022 First house in Kayak Way Ross River Estate Lot 62 roof works next week
14.01.2022 Lot 71 Wakeboard Blocklayers just about finished Roof next week
14.01.2022 Lot 62 Kayak Way Roof works under way
14.01.2022 Lot 77 Wakeboard Crt Ross River Estate Another one of Mayneside Developments new designs Keep and eye on this one
13.01.2022 How the Mayneside Subbies spend an afternoons smoko
13.01.2022 Lot 71 Wakeboard internal frames are installed now for pre wire and plying tough in Renderers have finished Windows in next week
13.01.2022 Lot 71 Wakeboard Kelso Slab being poured Concrete by Hy-tec ABR Lulham Concrete Constructions doing the concreting
13.01.2022 Lot 56 Wakeboard Crt Ross River Estate Truss frame up Roof soon
12.01.2022 Lot 92 Wakeboard Crt Kelso Open for inspection this weekend Come have a look 8 more to come
12.01.2022 Lot 77 Wakeboard New design Keep on eye on Ross River Estate 4 new designs to be started
11.01.2022 Front steps and slab prep underway at China St
10.01.2022 China St Lifted and ready for New posts
10.01.2022 Lot 18 Banfield dr What a week No sewer Point for the house from the main 2 days to put in new connection Now to get the slab finished by next weekend
10.01.2022 Lot 57 Wakeboard Ross River Estate New design keep on eye on this little beauty Construction starting next week
10.01.2022 Banfield Dr Painters have sprayed sealer now to gap and patch before final wall colours
09.01.2022 Drainage has started at Lot 18 Banfield Dr
09.01.2022 Mayneside Developments Wakeboard Cct projects
09.01.2022 Starting the landscaping And the driveway crossovers today Banfield Dr
09.01.2022 Finishing off the Electrical and plumbing at China St Getting close now to finishing
09.01.2022 Block work finished Pouring bondbeam today Truss's Monday
09.01.2022 Mayneside Developments first major Project Administration job Keep an eye on this Development Refurbishment of existing building and the construction of 3 new Architecturally designed Town Houses Watch this space
06.01.2022 Lot 100 is under contract Be quick radio and newspaper advertising has started Listen to 103.1 fm between 6&9 am
05.01.2022 Lot 71 Wakeboard Crt Kelso Truss and block work finished Roof sheeting fascia and gutter starting tomorrow
05.01.2022 Finishing touches to our next home ready this weekend Come visit
05.01.2022 Lot 71 Wakeboard underway drainage today Slab in by Thursday afternoon
04.01.2022 Truss are up at Lot 18 Banfield Dr
03.01.2022 Fascia and gutter being installed at 71 Wakeboard
03.01.2022 Lots 95/94 wakeboard Cct truss up ready for roofs
03.01.2022 Big couple days Landscaping at Lot 18 Banfield Drbfor the Mayneside developments crew Deco to house surrounds Stormwater Rock gardens and irrigation For the turfed areas... Then the fencing Electrical and plumbing fit out As well See more
03.01.2022 Block work lot 95 Wakeboard Cct Kelso Display home underway
03.01.2022 Try our hand at something different concreting a pool surround
03.01.2022 First 3 houses all finished come and inspect Display home this weekend
03.01.2022 3 new houses under construction in Wakeboard Crt Lots 71 Sold Lot 72 roof on Lot 73 ready for the block walls to be installed
02.01.2022 Lot 18 Banfield Dr Slab being poured today
01.01.2022 Mayneside Developments Subcontractors at work on New house at 7 Doriemus Ct Kelso
01.01.2022 Finishing off the roof today at Banfield Dr
01.01.2022 Tiling floors at Banfield Dr Kitchen install Thursday Carpenters to do internal fitout next week