Australia Free Web Directory

MB Design & Drafting | Businesses



Click/Tap
to load big map

MB Design & Drafting

Phone: +61 421 759 088



Reviews

Add review

Click/Tap
to load big map

25.01.2022 Interesting outcome.



25.01.2022 Re-roofing, Re-cladding, etc. going well; currently getting painted externally and internals being plastered.

24.01.2022 Worth a read about this BAL FZ standard home surviving.

23.01.2022 Concepts plans for minor alterations and additions about to commence for this incredible house. Yes that is a tower with battlements, yes it has a moat and drawbridge.



22.01.2022 Studio portal frames going up.

22.01.2022 A variety of jobs under construction. Footings poured on one, cladding about to start on another and cladding almost complete on the other.

20.01.2022 Faulconbridge cottage porch and carport additions Photos courtesy of the owners



12.01.2022 Big renovation with alterations and additions well underway in Glenbrook.

12.01.2022 A carport addition and a pergola addition in Glenbrook.

11.01.2022 Fender walls and ant capping done. Floor structure underway. This is gong to be a fantastic character cottage when completed.

08.01.2022 Miners Cottage rear addition. Builder is well underway with construction. Chris Clarke - CDC Building - Hazelbrook - 0421 259 073

07.01.2022 Kitchen and upper level bathrooms coming along nicely on this renovation. Will add the new addition pictures soon.



05.01.2022 New studio being constructed in Faulconbridge. Slab poured this morning by Impressions Concrete. Walls and roof to be clad in Monument metal sheet. Now we wait for concrete to set up then it can be helicoptered for an awesome finish. Going for polished concrete for low maintenance.

05.01.2022 Construction going well on this alterations and additions project to an existing brick veneer. It’s in BAL Flame Zone so works have to meet this, the highest bushfire attack level! Completion date is before Christmas. Well done to MH Carpentry, local Blue Mountains builders.

03.01.2022 Alterations and additions job in Springwood underway. Steel frame, structural steel and LVL rafters. Few interesting details going on using recycled sleepers.

03.01.2022 Character cottage renovation and additions is progressing quickly by the amazing builders. Wayne Sakey & Sons. 0414 395 731.

01.01.2022 Double carport under construction. The approval process is not as simple as you’d expect when you have to construct forward of the building line along a narrow street as this is outside of the standard council regulations. However with the correct plans, documents and knowledge of the process it can be quite painless. Nice workmanship by Jason Collins Carpentry & Building.

01.01.2022 Big renovation, alterations and additions in Emu Plains coming along well. The builder has done an amazing job with roof, flooring and walls all cut on site. Cladding has started and should be done by end of the week.

22.12.2021 Existing garage demolished then existing slab to be removed. Two level of garage with studio above. Included bathroom and a wash up. To be used for high end Air BnB and holiday let. Being on the south side of Wentworth Falls it’s close to bushwalking tracks and Conservation Hut so will be super popular.

25.11.2021 Emu Plains major renovation, alts and adds. Photos do not do it justice! Once complete this will be a stunning home.

23.11.2021 This character cottage in Leura was designed a few years ago by us. 4 bedrooms and 2 bathrooms, raked ceiling in living areas and high ceilings to the rest. Timeless and classic.

07.11.2021 Character cottage renovation and additions is progressing quickly by the amazing builders. Wayne Sakey & Sons. 0414 395 731.

23.10.2021 Fender walls and ant capping done. Floor structure underway. This is gong to be a fantastic character cottage when completed.

10.10.2021 A variety of jobs under construction. Footings poured on one, cladding about to start on another and cladding almost complete on the other.

27.09.2021 Big renovation, alterations and additions in Emu Plains coming along well. The builder has done an amazing job with roof, flooring and walls all cut on site. Cladding has started and should be done by end of the week.

17.09.2021 A carport addition and a pergola addition in Glenbrook.

Related searches