25.01.2022 Nice frosty mornings
24.01.2022 Loaded ready to go Thanks BMD for the awesome time Off to Newcastle for a new RMS project
20.01.2022 ** Position Vacant ** 2x Water truck drivers needed for a project in Narooma Trucks are auto... 2x Rigid tipper drivers Must have experience Rms print out White card 0421166621
17.01.2022 The old girl still going strong and out doing the new trucks #gettingpaidthesame
16.01.2022 Another big effort completed ready for seal Monday
15.01.2022 All Loaded up for another project Contractor phoned on Friday wanting the grader for a Monday start doing Pavements on a RMS project, 600k float to its new project The Contractor wanted a grader familiar with the pavement types and a great past history sure helped this out.
14.01.2022 65,000 tonnes of road base zero compaction failures
09.01.2022 HOW AWESOME IS THIS! After years of hard work, I am pleased to deliver the new Dignams Creek bridge, which from today will have traffic on it for the first time... This is huge news for our region. No more accidents on the old bridge. I couldn’t be more happy!! Awesome for our region, residents and visitors, just in time for Christmas and the New Year
07.01.2022 Olympic Highway Upgrade for BMD/RMS
07.01.2022 Another massive contract signed this morning, should hopefully see us busy until 2020
07.01.2022 *Position Vacant* Seeking a Final Trim Grader Operator for highway upgrades Work will be in Victoria Well maintained M series graders Trimble Uts experience a must... Ute and accomodation supplied Attractive hourly rate Must have experience doing pavements 0421166621 [email protected] See more
06.01.2022 36 tonne excavator recovery, but with a story that is more amazing than the recovery. Operator with over 30 year’s experience was operating alone cleaning a da...m when heavy rain hit, so he stopped work and started to walk the machine back up hill. The tracks spun, and the machine started to slide backwards. He lowered the blade, and went to catch with bucket, but to his shock it didn’t stop and slid quickly straight down into the deep dam. The cab went straight under, and the weight of the water wouldn't allow him to open the door. With the ROPS protection he was unable to get through front or the roof hatch. As panic set in he tried kicking out side windows with no success. The bottom front window then busted under the weight of the water filling the cab in seconds. To the operators luck once the cab filled with water he found the machine settled in a depth of water to allow a centimetre air gap against the roof that he could just get his nose into to breath. He then made several attempts diving down attempting to open the door, and with luck due to the water equalizing inside and out, was able to get it open, and make his escape. A lucky escape, and as he said it shows you can operate in some of the worst sites possible with no issues, but it’s something simple, in a split second, that can catch you out. See more
05.01.2022 Another year has wrapped up for us, 7th year in business hasn’t been the best but we have struggled through, unfortunately got promised the world with a major project which never delivered. Projects for us in 2018 - Pavement works and completion of the Tourle street bridge - WBHO... - Pavement works and completion of the Princess highway at Winchelsea - WBHO - Early works for Stockyard hill wind farm - WBHO - Pavement works for the Gocup Road project - ERTECH - Pavement works and completion of the Dignams Creek project - Fulton Hogan Merry Christmas from the team at M&T Grader Hire and thanks to all our contractors and subcontractors for the year Hopefully next year we will come back stronger
04.01.2022 Princess Highway duplication completed Now a 3am 130k drive to the next project
04.01.2022 All done and dusted opening today