Modular Building Systems Pty Ltd in Smithfield, New South Wales, Australia | Home improvement
Modular Building Systems Pty Ltd
Locality: Smithfield, New South Wales, Australia
Phone: +61 1800 217 131
Address: 132 Warren Road 2164 Smithfield, NSW, Australia
Website: http://www.mbs.com.au
Likes: 285
Reviews
to load big map
23.01.2022 Arndell Anglican College, NSW MBS were engaged to design, manufacture & install a Design Studio at Arndell Anglican College Park which included design studio classrooms, meeting room, store room & a staff room in Oakville, NSW. The design & construct scope included additional upgrade requests from the client that included acoustic ceilings, upgraded cladding & additional covered outdoor areas which were accommodated early during the design phase. ... Critical Success Factions included: - Permanent look & feel for this Design Studio - Achieving high quality learning environment - Meeting the clients exact scope and time frame (12 weeks) If you are interested in Classrooms, Staff Rooms or other School Facilities, get in contact with us today! +61 2 8718 2500 or www.mbs.com.au
20.01.2022 MBS recently Sponsored the Prisons 2017 Conference. MBS exhibited, hosted the Networking Drinks & chaired Day 2 of the Conference. Thank you to our GM, Lew Deegan for chairing the Conference. If you are interested in our Modular Correctional Buildings or our CellPOD Modular Steel Cells, please contact us for more information via [email protected] or +61 2 8718 2500.
18.01.2022 MBS recently completed a Learning Centre at Penrith Anglican College for a compliant cost effective short term requirement, that is easily relocatable for future proofing. The Learning Centre comprised of 2 classrooms, with each having a large store room & a wash trough area for students to use.
17.01.2022 On Friday, MBS staff wore their favourite sporting jerseys for Jersey Day to help raise awareness of The Organ & Tissue Authority, as well as the DONATE LIFE network. To learn more please visit http://www.jerseyday.com.au/
15.01.2022 Registrations now open | Book your 2018 PrefabAUS Conference ticket today! http://portal.prefabaus.org.au/event-2727706/Registration
13.01.2022 CellPOD Cells are the Next Generation for the #Corrections Sector. Click on the link below to find out more
12.01.2022 MBS will be exhibiting at the 18th Annual Learning Environment Australasia Conference at the Hilton Hotel (Sydney) next month. For more information or to register, visit http://3rs.a4le.org.au/
10.01.2022 Rules Club - Wagga Hotel The new 4 star, 3 storey hotel built by MBS has now been in operation for over 12 months and receiving rave reviews from their guests. The modules were all designed and built offsite in the MBS factory in Smithfield (NSW), which provided a higher quality, minimal site disruptions, reduced environmental waste and halved the overall project timeline; compared to a conventional build. ... Next time you're visiting the Wagga Wagga region, book a night here to see for yourself. http://www.qualityhotelrulesclubwagga.com/
08.01.2022 Time & Cost Efficiency with Modular Build #Classrooms
07.01.2022 Mulgoa Sanctuary Sales Office MBS were engaged to design, manufacture & install a New Sales Office for the Mulgoa Sanctuary Development. The Sales Office included an Office, Kitchen, Sales area & Amenities. MBS worked closely with the Client during the design phase to ensure the Sales Office not only met their requirements of having a permanent look and feel but also with flexibility to be relocated and used for different purposes in the future. With this in mind the buildi...ng was designed to be easily relocated, as well as being able to add additional fittings/fixtures & get maximum use out of the space. If you're interested in a Sales Office for your next project, contact MBS on +61 2 8718 2500 or [email protected]
05.01.2022 What is Modular School Design?
02.01.2022 Another great looking Permanent Modular Learning Space delivered for Arndell Anglican Junior School by MBS. This learning space was built offsite and installed in a total time frame of only 10 weeks and ready for the start of 2018. If your school is looking for a similar solution just contact the team at MBS.
01.01.2022 Bethany College | Multistory Learning Centre Built under CDC requirements & installed during a 2 week holiday period; with a flexible design to allow for a simple & cost effective relocation to another Sydney Catholic Schools' site in the future.
Related searches
- Mark Oliver Plumbing And Gas Fitting
Home improvement Plumbing service
+61 418 836 473
Trott Park 5158 Adelaide, SA, Australia
33 likes
- Express Lawn Mowing Adelaide South
Home improvement Landscape company Gardener
Edwardstown 5039 Adelaide, SA, Australia
101 likes
- Fenwick Design
Home improvement Interior design studio
+61 410 534 326
Norwood 5067 Adelaide, SA, Australia
269 likes
- Atlas Tree Service & Stump Removal
Home improvement Landscape company Tree cutting service
+61 417 812 465
113 likes