Australia Free Web Directory

Morton Engineering Group in Lytton, Queensland | Metal supplier



Click/Tap
to load big map

Morton Engineering Group

Locality: Lytton, Queensland

Phone: +61 7 3396 5322



Reviews

Add review

Click/Tap
to load big map

23.01.2022 Three big boys nearing completion, big effort by everyone so far. Keep up the good work



23.01.2022 40 mtr gallery near completion. Coming together nicely.

21.01.2022 Day 4 - Out with the old in with the new. Morton Engineering team doing a great job onsite. Adopting our core values - Safety, Quality, relationships and Delivery.

21.01.2022 Big lift in the workshop to get the rig frame over



20.01.2022 Currently pumping one of these a week out our workshop, weve got 9 more to go this year

19.01.2022 Here we go again, the scope, a little bigger with four units well underway. Top notch effort by the team involved.

19.01.2022 Currently pumping one of these a week out our workshop, we’ve got 9 more to go this year



17.01.2022 First day of a 2 week shutdown underway. Scope of work is removal and installation of 5 x Feed Hoppers and 3 x Silos. All works kicked off safely and going to plan.

17.01.2022 Second side done and dusted

17.01.2022 Feed conveyor module on its way to Horsham

15.01.2022 **Boilermakers & Welders required** Morton Engineering require experienced Boilermakers & Welders at their Lytton Workshop - 45-55 hrs per week... - Hourly rate + Penalties Must be Reliable, have own transport and will to work in excess of 40hrs when required. Please contact the office on(07) 3396-5322 or send resume to [email protected]

14.01.2022 Project completion and awaiting despatch. Great job Morton engineerings project and fabrication team.



13.01.2022 Fabrication Crew - 1 of 2 - 90t solos complete. Another Quality Job completed safely. Top effort

13.01.2022 Can’t wait to see this big boy finished in the next two weeks and shipped to PNG

12.01.2022 First of six wash water trays nearing completion

12.01.2022 Zero incidents , Zero rework and Delivered and Erected on time. Well done to Morton Engineering Fab and Erection crew on another job near complete. Maintaining our core values Safety, Quality, Relationships & Delivery. Top Effort

11.01.2022 2nd 18mtr x 3mtr pipe rack module underway. The team working hard trying to meet tight project deadline. Always keeping safety as a value not a priority. As we all know prioritys change.

11.01.2022 QAL- Trail assembly success. Proving our team is still capable of maintaining quality whilst working directly from engineering drawings. Top effort both the fabrication and project team.

06.01.2022 Morton Engineering Fabrication Crew 40 metre gantry,complete with internal Airslide. Another project well underway .

06.01.2022 Cant wait to see this big boy finished in the next two weeks and shipped to PNG

06.01.2022 Great to be involved with Glencore projects

02.01.2022 Off to the rubber liners

02.01.2022 Truss on its way to PNG well done team

02.01.2022 Successful 35t trial lift of the rig today in our yard, well done to everyone involved.

01.01.2022 Nearing completion of the 44t lifting rig frame

01.01.2022 https://www.linkedin.com//activity-6765134315899760641-gxW-

Related searches