Australia Free Web Directory

Mosman Bathroom Renovations | Home improvement



Click/Tap
to load big map

Mosman Bathroom Renovations

Phone: +61 418 649 526



Reviews

Add review

Click/Tap
to load big map

23.01.2022 Extensions all prepped waiting for the big pour.



20.01.2022 From stripping out the bathroom to the end product takes time and patience, the owners need to be prepared for the start by purchasing all your tiles and bathroom accessories and then discussing with us how you would like it all planned out. These decisions need to be made before any tile can be layed.

19.01.2022 A good day for forming up and pouring some concrete.

19.01.2022 Waterline tiling getting ready for this families swimming for summer.



18.01.2022 One of 2 bathrooms in Cremorne just waiting on a shower screen and then we're done. This room was previously a laundry the current owner/resident decided she wanted 2 bathrooms upstairs and to relocate her laundry downstairs to the kitchen galley. If you have a question or would like a free consultation give us a call or send us a message.

18.01.2022 Feature walls can make a bathroom, this was one of my favorites to make but the stairs were abit painful.

17.01.2022 One of 2 bathrooms in Cremorne just waiting on a shower screen and then we're done. This room was previously a laundry the current owner/resident decided she wanted 2 bathrooms upstairs and to relocate her laundry downstairs to the kitchen galley. If you have a question or would like a free consultation give us a call or send us a message.



13.01.2022 Out with the old and in with the new, walls ready to be primed and waterproofed next to tile the floor.

09.01.2022 Prepping for a full bathroom renovation, using tessellated tiles for the floor as directed by our customer.

08.01.2022 Recent works @ Warringah Bowls Mosman removing trip hazards so people can get in and out safely.

03.01.2022 Prepping for a full bathroom renovation, using tessellated tiles for the floor as directed by our customer.

16.12.2021 Waterline tiling getting ready for this families swimming for summer.



07.12.2021 Out with the old and in with the new, walls ready to be primed and waterproofed next to tile the floor.

28.11.2021 Recent works @ Warringah Bowls Mosman removing trip hazards so people can get in and out safely.

17.11.2021 Extensions all prepped waiting for the big pour.

04.11.2021 Feature walls can make a bathroom, this was one of my favorites to make but the stairs were abit painful.

05.10.2021 From stripping out the bathroom to the end product takes time and patience, the owners need to be prepared for the start by purchasing all your tiles and bathroom accessories and then discussing with us how you would like it all planned out. These decisions need to be made before any tile can be layed.

Related searches