MRJ Industrial Services in Bagdad, Tasmania | Home improvement
MRJ Industrial Services
Locality: Bagdad, Tasmania
Phone: +61 409 477 422
Address: 283 E Bagdad Rd 7030 Bagdad, TAS, Australia
Website: http://www.mrjindustrial.com.au
Likes: 269
Reviews
to load big map
22.01.2022 Team MRJ worked hard to upgrade this food production area in a 3 day period. Remove old cove and floor finish, install new cove and new epoxy floor that has a heavy texture for non slip. The enquiry came in last week and started with can you do it next week
21.01.2022 Team MRJ installing a structural waterproof render on the negative side of this internal retaining wall.
17.01.2022 Team MRJ over the last 25 hrs installed some pu cement and epoxy flooring patches.
15.01.2022 Team MRJ strike again. What a challenge this one presented with water seepage issues. But regardless we got there in the allotted timeframe. This is a pu cement with a 100 mm cove.
14.01.2022 Team MRJ have installed a new non slip surface in this storage area with ECTR Fast Cure epoxy.
11.01.2022 Team MRJ have battled through some tough going on this floor to try and deliver something half decent. We all should know that not all jobs come easy. This was tough as it’s a working factory with wet cleaning each day, food oils then very bad crumbly concrete. Also got in this morning to find trollies pushed onto the epoxy floor. Floor is double primed then a 2.5 to 3 mm self level epoxy broad cast out with aluminium oxide and a topcoat of epoxy. Note the drain install aswell.
10.01.2022 What a week Team MRJ have had. 60 odd linear metres of hand trowel cove with aluminium arrow head trim. Behind the cove is a water proof membrane aswell The f...loor for most was an existing epoxy finish but we did do a small section of 40 m2 as a 3 coat system with CTM ECTR Great result and a happy client See more
08.01.2022 Thanks for sharing and positive feedbacks from Mark Jones
08.01.2022 Team MRJ have knocked out a quick front entrance transformation over two days. Removing tiles then a lot of patching. ECTR Fast Cure base coat followed by 2 coats of MRJ PA 100 polyaspartic.
06.01.2022 Team MRJ completed this flake floor in a back of house food prep area in a total of 26 hours. We removed the vinyl, patched the defects, prepared the concrete and installed the flake as a four coat system with our new 100 % solids polyaspartic PA 100. Typical cure is 1.5 hrs between coats. PA 100 is a low odour product which was ideal for this client (they were a little nervous on past experiences of food loss from high odour products used by others in the past). Great outcome happy client.
04.01.2022 Team MRJ have done a lot of Black Granite flake lately here is an ensuite and laundry over existing tiles.
01.01.2022 Team MRJ installing another waterproof render to over come a leaking retaining wall.
01.01.2022 Team MRJ installed a new non slip for this bakery over the last 2 nights (5 pm to 11 pm) each night. Move gear aside do first half then night 2 move the gear to other side. Roughly 2 hrs prep each night, install base and non slip media and wait roughly 1 hr then sweep and install topcoat. Thank god for MRJ PA 100.
Related searches
- Glitter Wallpaper Perth & Golden Touch Painting & Decorating
Home improvement Home decor House painting
+61 418 296 828
4124 likes
- Peninsula Electrical & Data
Electrician Businesses Local service Home improvement Business service Contractor
0449991766
50 likes