Australia Free Web Directory

MRT Homes in Oakleigh, Victoria | Property developer



Click/Tap
to load big map

MRT Homes

Locality: Oakleigh, Victoria

Phone: +61 3 9530 4188



Address: 7 Railway Ave 3166 Oakleigh, VIC, Australia

Website: http://www.mrthomes.com.au

Likes: 127

Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 Bricklayers have been busy starting all the block work.



25.01.2022 East Doncaster...so good to see the frame go up!

24.01.2022 Butlers pantry was installed during the week, kitchen was delivered and started getting installed on Friday. Blinds and carpet went in yesterday its all coming together.

23.01.2022 Mt Waverley - Illuka Crescent - 2 Double Storey Townhouses



23.01.2022 Were bricking up the garages and starting the timber framing.

21.01.2022 Our new project is almost ready to start.

21.01.2022 Cedar cladding finished around the front of the house!



20.01.2022 Finally we get to see the front of this Stunning Architectural Desiged house in Glen Waverley...job complete

19.01.2022 Doncaster East - Icey start to this beautiful Friday morning, roof sheets getting craned up!

19.01.2022 Elysium Street, East Oakleigh - 2 side by side stunning townhouses, almost done. Look at the beautiful exposed staircase, and those pendants in the kitchen just adds that special touch...will keep you posted with more updates

17.01.2022 Stirling Street, Mt Waverley - walk in robe in ensuite, closed off with cupboards with a mirror at the end....clean finish.

17.01.2022 Metal cladding is all finished and looking fantastic. Alucobond is all done and driveway is sealed. Been a busy week.



17.01.2022 Been another busy couple of weeks, all shower screens were installed. The tiler has started down stairs and all the vanities have been finished!!

16.01.2022 Driveway is done!

16.01.2022 Doncaster...Birds Eye View

16.01.2022 Something different, black taps and round mirrors in the bathroom...stunning

15.01.2022 A lot has been going on the last couple of weeks. Stairs treads are on and stained, all the bathrooms are finished, outdoor balcony balustrade was fitted and backyard concert was poured.

15.01.2022 Roof tiles are going on.

15.01.2022 Busy week last week, all the vanities were installed, the kitchen wall was cladded with cedar and all the storage cabinets went into the bathrooms.

13.01.2022 Two Townhouses completed in East Oakleigh

13.01.2022 The tiler has started the bathroom floors. Very exciting!!

12.01.2022 The backyard has concrete! No more mud..

12.01.2022 MRT has been busy this week, the anston pavers are coming along around the pool.

10.01.2022 Demo time at 12 Carmichael Road Oakleigh East. Should start building in a few weeks. Thanks to Demolition Depot for the good work.

09.01.2022 Units 1, 2 and 3/33 Swanpool Ave, Chelsea Townhouses, up for Sale, absolutely stunning...close to shops and beach.

09.01.2022 Chelsea Town Houses - few more minor touches and all complete ready for sale.

09.01.2022 Waterproofing walls at Stirling crescent

09.01.2022 ...almost ready to fill up

08.01.2022 Poured the lower ground slab at Stirling Crescent! Very exciting.

07.01.2022 Getting ready for slab!

07.01.2022 Doncaster East job has commenced (2 Townhouses) first bored piers has started...

07.01.2022 Nearly finished the frame at Alward Ave.

06.01.2022 All rendered and getting ready for plaster at Calista Ave.

06.01.2022 Our new job started a couple of weeks ago. Pouring the concrete slabs.

05.01.2022 All the lower ground floor blockwork is complete and corefilled. Getting ready to lay the ground floor blocks.

04.01.2022 Two Double Storey Townhouses - Mt Waverley - Illuka Crescent

04.01.2022 Stunning Architectural Designed House in Glen Waverley - thank you to all the trades that were involved in the construction - looks amazing.

02.01.2022 Milton ave - Frame is finished, full steam ahead with lock up stage.

02.01.2022 Just finished the best looking townhouses in Clayton South!!!

02.01.2022 Chelsea Townhouses...almost complete

02.01.2022 The tiler had been busy, wall tiles are almost done and mosaics are up.

01.01.2022 Pool is covered and getting tiled!! Almost time to swim...

01.01.2022 Starting to look like a house. Nearly ready for painting.

01.01.2022 All the ground floor structural steel is being installed.

01.01.2022 Stormwater time at Prince Charles st, were almost finished.

Related searches