ngdwaterworks | Construction company
ngdwaterworks
Phone: +43 1 703647
Reviews
to load big map
22.01.2022 Pontoon constructed and installed ready for summer @ Port Hacking, New South Wales, Australia
21.01.2022 The crew that make it happen @waterstom9
20.01.2022 Custom oversized pontoon built and installed for our friends at Dick Rowe Marine. @ Drummoyne, New South Wales, Australia
20.01.2022 Moulded pontoon fully refurbished for Harbour Constructions Pty Ltd
19.01.2022 Fully engineered oversized pontoon competed with a full length swim platform. Installed by @lgbmarinecontracting
19.01.2022 Moulded Pontoon || Full refurbishment of this pontoon competed for @harbourconstructions @ Kurnell, New South Wales
18.01.2022 Flush Mount Pontoonrecently constructed for our friends at Dick Rowe Marine.
18.01.2022 A pontoon refurb recently completed. This pontoon was finished off with a grey non slip deck and the best @australianjettyfenders system to protect any boats pulling in #ngdwaterworks #marineconstruction #yowiebay
17.01.2022 Pontoon constructed and installed with a 7 meter ramp to push it out past the rock shelf @ Yowie Bay, New South Wales, Australia
16.01.2022 New custom Build pontoon with a full length canoe seat, Finished with a cream non slip deck @ Grays Point, New South Wales, Australia
16.01.2022 Illawong Pubic Wharf NGD assisted in the structure of this jetty for our friends at Dick Rowe Marine @ Illawong
16.01.2022 Rutherford Jetty complete
16.01.2022 Refurbished Pontoon- For Dick Rowe Marine after this pontoon had sunk. @ Port Hacking, New South Wales, Australia
15.01.2022 Pontoon Refurb this pontoon had a hole in due to the JetSki dock hitting against it. Installed with new Stainless brackets to prevent this from happening. @ Burraneer, New South Wales, Australia
14.01.2022 Pontoon Refurbishment || Completed with @australianjettyfenders @ Burraneer Bay
13.01.2022 Our biggest pontoon yet! We recently completed this project for Dick Rowe Marine who did the install. Custom 8 meter pontoon for Yowie Bay Sailing Club. @ Yowie Bay, New South Wales, Australia
13.01.2022 Jetty lighting at our Burraneer project. @ Burraneer Bay
13.01.2022 Throw back to one of our favourite jobs we completed last year on Taloombi Street Cronulla. New Hamptons style boathouse with en-suite and a large deck with beach shower and surfboard racking @ Cronulla Beach, New South Wales, Australia
12.01.2022 Pontoon Refurbished || This pontoon had structural cracks causing it to take on water. @ Oyster Bay, New South Wales, Australia
10.01.2022 Our Yowie Bay job completed with all new decking, new handrail, slipway infills, pontoon refurb, a new ramp and bearers #marineconstruction #ngdwaterworks #porthacking
09.01.2022 Skid ramp competed in gymea bay to replace the existing ramp. @ Yowie Bay, New South Wales, Australia
09.01.2022 Oversized pontoon fully refurbished for Harbour Constructions Pty Ltd with a complete new back side installed and all leaks repaired after it had sunk || Big thanks to Dick Rowe for the Tele Handler Hire @ Kurnell, New South Wales
09.01.2022 New pontoon gangway installed in Yowie Bay @ Yowie Bay, New South Wales, Australia
09.01.2022 Two Jarrett backsaves installed for Richard Crookes Constructions at Dawes point @ Sydney Harbour
09.01.2022 Black pontoon with timber top This refurb was completed a while back for Dick Rowe Marine
08.01.2022 A recent project we completed at Cronulla, turning this dead area into a new bedroom with en-suite and a great deck for entertaining. All materials were brought in by barge #marineconstruction #carpentry #ngdwaterworks
08.01.2022 Jetty Extension || Pontoon and Aluminium Ramp || JetSki Dock installed with 6 piles @ Connells Point, New South Wales, Australia
06.01.2022 Jetty we completed back in January, finished off with Australian hardwood decking @ Burraneer Bay
06.01.2022 Standard Pontoon with swim step|| Constructed & Installed by N.G.D. Waterworks @ Burraneer Bay
06.01.2022 Custom built pontoon with full length swim step installed in Yowie Bay ready for summer
06.01.2022 False ceiling installed to underside of boardwalk balcony at Luna Park @ Luna Park Sydney
05.01.2022 Slipway repairs complete|| 4 piles re sleeved along with 2 custom fish plates added
05.01.2022 Second Hand pontoon installed in Kogarah Bay. Fully refurbished from a ramped front to a standard deck @ Sans Souci, New South Wales, Australia
04.01.2022 Pontoon Refurbishment Completed in Gymea Bay @ Gymea Bay, New South Wales, Australia
04.01.2022 4.2m Top Mount Pontoon Built by N.G.D. Waterworks
03.01.2022 Yowie Bay pontoon refurb finished off with @australianjettyfenders and a new Modwood ramp #marine #marineconstruction #waterfront #jetty #porthacking #yowiebay # pontoon
02.01.2022 Slipway Rails- Installed in Gymea Bay @ Gymea Bay, New South Wales, Australia
02.01.2022 Top mount pontoon constructed and installed on the port hacking.
02.01.2022 Jarrett crane and tinny cradle recently installed at our Yowie bay job. @ Yowie Bay, New South Wales, Australia
02.01.2022 Jetty rebuild 6 piles re-sleeved after the old piles had snapped in a storm, Finished off with Australian Hardwood @ Yowie Bay, New South Wales, Australia
Related searches
- Greendale Timbers
Home improvement Hardware shop Construction company Lumberyard
+61 2 9905 0400
14 Green Street 2100 Brookvale, NSW, Australia
88 likes
- Griffiths Concrete & Construction Services PTY LTD
Home improvement Construction company
+61 419 170 688
303 likes
- Gentry Constructions
Home improvement Construction company Deck & patio builder
+61 425 337 753
113 likes
- Homemaster Builders Brisbane
Home improvement Construction company Contractor Carpenter
+61 407 033 581
Taringa Brisbane, QLD, Australia
169 likes
- Bartholomew's Design
Shopping & retail Construction company Furniture shop Cabinet & worktop store
+61 402 418 545
14 Milson place 6163 O'Connor, WA, Australia
812 likes