24.01.2022 The final bridge beams at the Melton Highway level crossing removal being lifted into place. Well done to Troy (our senior surveyor on the project), all the BMD crew and everyone involved. It was certainly testing conditions this weekend.
23.01.2022 Final level checks prior to the first bridge deck pour planned for tomorrow at the Melton Highway level crossing removal.
17.01.2022 Getting ready to mark out the pedestals at the Thompsons Rd level crossing removal. Was lucky Garry enjoys working at heights
15.01.2022 A large milestone recently achieved on one of our major projects. Well done to Troy Borton (our senior surveyor on the project), all the BMD crew and all subcontractors involved. Certainly a job well done considering the adverse weather conditions.
01.01.2022 A successful night lifting the first of 16 beams at Swan St. A very complex job done well, with the 16 tonne beam placed in position within the very small tolerance successfully. Well done Martin and Rob!