Australia Free Web Directory

Ozone Air Conditioning Pty Ltd in Castle Hill, New South Wales, Australia | Heating, ventilating & air conditioning service



Click/Tap
to load big map

Ozone Air Conditioning Pty Ltd

Locality: Castle Hill, New South Wales, Australia

Phone: +61 2 9358 2121



Address: 27/7 Hoyle Avenue 2154 Castle Hill, NSW, Australia

Website: http://ozoneairconditioning.com.au/

Likes: 704

Reviews

Add review

Click/Tap
to load big map

17.02.2022 First week of 16 months in the beautiful Ayers Rock. Ozone Air Conditioning have been engaged to complete the replacement of 230 chilled and hot water FCU systems with new units, valves, actuators, grills, controls and toilet exhaust.



15.02.2022 8 months, 35 air conditioning systems and lots of labour later, almost completed stages 1 and 2 of Australian Institute of Music in Surry Hills

12.02.2022 First week of 16 months in the beautiful Ayers Rock. Ozone Air Conditioning have been engaged to complete the replacement of 230 chilled and hot water FCU systems with new units, valves, actuators, grills, controls and toilet exhaust.

07.02.2022 Works are ramping up at St Clare High School. 52 units accross 5 daikin VRV systems... all to be completed by Christmas



31.01.2022 Final day of works at Manly Wharf. Completion of two stages. Over 15 months since commencement. Building works included the new level on top of the exisitng Manly Wharf building. Our works included the relocation of services on the ground level and provision of services on the newly built level. This included smoke exhaust, kitchen exhaust, ventilation and new and relocated air conditioning throughout.

24.01.2022 Final day of works at Manly Wharf. Completion of two stages. Over 15 months since commencement. Building works included the new level on top of the exisitng Manly Wharf building. Our works included the relocation of services on the ground level and provision of services on the newly built level. This included smoke exhaust, kitchen exhaust, ventilation and new and relocated air conditioning throughout.

23.01.2022 8 months, 35 air conditioning systems and lots of labour later, almost completed stages 1 and 2 of Australian Institute of Music in Surry Hills



17.01.2022 After 8 months on site this project is finally coming to an end. 34 apartments, commercial, retail and two levels of car park. Project completed ahead of schedule and on budget. Pittwater Road, North Narrabeen.

16.01.2022 Works going well at Novatel Darling Harbour. Almost half way through the upgrade of 230 hotel rooms. Including new air conditioning in each room, toilet exahust, BMS controller, electrical works and a face lift to the common areas. The hotel is getting renovated level by level and remains operations on all other levels during the works.

16.01.2022 Works are ramping up at St Clare High School. 52 units accross 5 daikin VRV systems... all to be completed by Christmas

13.01.2022 8 months, 35 air conditioning systems and lots of labour later, almost completed stages 1 and 2 of Australian Institute of Music in Surry Hills

13.01.2022 Works are ramping up at St Clare High School. 52 units accross 5 daikin VRV systems... all to be completed by Christmas



08.01.2022 Works going well at Novatel Darling Harbour. Almost half way through the upgrade of 230 hotel rooms. Including new air conditioning in each room, toilet exahust, BMS controller, electrical works and a face lift to the common areas. The hotel is getting renovated level by level and remains operations on all other levels during the works.

01.01.2022 Final day of works at Manly Wharf. Completion of two stages. Over 15 months since commencement. Building works included the new level on top of the exisitng Manly Wharf building. Our works included the relocation of services on the ground level and provision of services on the newly built level. This included smoke exhaust, kitchen exhaust, ventilation and new and relocated air conditioning throughout.

19.12.2021 Works going well at Novatel Darling Harbour. Almost half way through the upgrade of 230 hotel rooms. Including new air conditioning in each room, toilet exahust, BMS controller, electrical works and a face lift to the common areas. The hotel is getting renovated level by level and remains operations on all other levels during the works.

Related searches