Australia Free Web Directory

Panda Custom Builds | Vehicle, aircraft and boat



Click/Tap
to load big map

Panda Custom Builds

Phone: +61 424 858 452



Reviews

Add review

Click/Tap
to load big map

25.01.2022 FZJ75 project has begun!



23.01.2022 Starting the strip down on the boat project

22.01.2022 Sorry folks for the long disappearance from social media. We're back and in full swing with two new projects! First up is a nautical refurbishment. We're doing a boat and trailer rebuild. Full interior and new electrics as well as new brakes and electrics for the trailer. We also have a 1994 HZJ75 Toyota Land Cruiser ute coming in for a complete overhaul to bring the 90's forward into the new century Stay tuned for awesome new updates coming soon.

19.01.2022 Brief interlude to the fzj75. Mount spotties and wire up on a hzj75. Cruiser utes everywhere here!



17.01.2022 Shovel holder, battery box and socket box mounted. Major rust in the roof repaired and sprayed. Side steps resprayed.

16.01.2022 XD120 Korr Spots install. These small lightbars pack a punch and are great for lighting up the wings, allowing you to see the roos and cows well beforehand.

15.01.2022 Project FZJ75 is now complete! All metal work polished, final detail and light bar fitted. Ready to go for hand over tomorrow.



13.01.2022 2 1/2" cat back exhaust upgrade on a GGN Hilux. Little more power and a much nicer exhaust note. Looks the goods too.

11.01.2022 Bullbar cleaned and sanded ready to polish. Cab has been washed, cut and polished. Just a whole lot of metal polishing to go and she should be ready.

09.01.2022 Been busy the last two days. Side lights, high mount lights, tray light and dual battery solenoid are now wired in. Tray has been cleaned and sanded with 2000 grit wet and dry ready for polishing. All under bonnet wiring done. Just need to clean the cab up, mount the light bar and cut and polish her and she'll be done.

08.01.2022 All wiring completed on the 75. Just need to mount the light bar and hook it up to the wiring loom. Battery override switch installed. Cab has been stripped, cleaned, polished and reassembled. Just exterior clean to go and she'll be done.

06.01.2022 Bullbar and side mirrors cleaned, sanded, cleaned again and painted. Rollbar and chassis black for metal and satin plastic black for the plastics.



06.01.2022 New project rolling in soon for over the Christmas period. FZJ75 getting a full work over. Service, new lights, uhf, dual batteries and more. Project starting in two weeks. Stay tuned for more.

01.01.2022 Plastics all sprayed. High mount bunny ears and work light mounted. Outline markers and dual battery solenoid mounted.

Related searches