PB & J Eco Built in Kilsyth, Victoria, Australia | Business service
PB & J Eco Built
Locality: Kilsyth, Victoria, Australia
Phone: +61 423 331 980
Address: Colchester road 3137 Kilsyth, VIC, Australia
Website: http://www.concretensteel.com.au
Likes: 336
Reviews
to load big map
24.01.2022 Do we deck even? Small wall and big deck! Over engineered beast. 190 bearers, 140 joists on 400 centres. Will be fully sealed pre boards and post frame inspection. #excavation #mitre10bayswater #pbjecobuilt #retainingwalls #deck ... #chirnsidepark See more
24.01.2022 Bulk of the sleepers in on the final wall at werribee. 100m of goodness that ate 43m3 of concrete! Back late next week to build thebfence on top too.
23.01.2022 And bang we are back in the hills. Next project is live in belgrave south. Shed demolish this morning before the rain hits! #pbjecobuilt #excavation #retainingwalls
23.01.2022 When fencing isnt your main game but you know how to get it done. 120m on board. 60 posts precut ready for on top of a wall. Last job at werribee about to kick off tomorrow. 3 day blitz! #pbjecobuilt #excavation #retainingwalls #werribee... #wedoitall See more
23.01.2022 Tight access monday in kilsyth. #noroom #kubota #retainingwalls
23.01.2022 Busy 2 days getting this one done too. Shed going in front of the wall so only 400mm needed. Bigger elsewhere. Tricky setup as the client had someone else dig the piers... not drill. Boxed them up. Still 3 times the concrete! #pbjecobuilt #excavation #retainingwalls
20.01.2022 Busy day. 36 x 1400mm holes drilled n ready to post. #pbjecobuilt #excavation #retainingwalls
20.01.2022 Quick 16m wall and 42m of pailing fence done in 3 & 1/2 days. Our angled sleepers to neaten it up. Charcoal plain sleepers Rgtimber products. #excavation #retainingwalls #pbjecobuilt #rgtimber
19.01.2022 Small tight access job in lilydale completed. Even demolished a gazebo, painted the gal posts and run mulch around for them to help finish the job off! Outstanding clients as well. Happy everybody!
19.01.2022 Packed n ready for a 6 week adventures in werribee. #pbjecobuilt #excavation #retainingwalls
17.01.2022 Neat 24m of walls in vermont south inc stairs. #covidsafeworks #excavation #pbjecobuilt
14.01.2022 Quick video of our covid safe job all done. Clients wrapped, every trade that has been on the site has complimented on the workmanship and attention to detail on the project. Happy to be done. #pbjecobuilt #retainingwalls #excavation
14.01.2022 Took a dilapidated 35yo redgum wall n made it into a rock sensation. Bulked over 80m3 into new spots around the property. 30T of Coldstreams and 6t of crushed rock. Also took 30m3 of pine to be recycled and a tip run of 8m3 of mystery fill. Happy client n happy crew.... New wacker neuson 6T is killing it and the new grapple is sooooo much fun to use! #pbjecobuilt #excavation #retainingwalls #coldstreamrock #boral #wackerneuson #isuzu #getitdone See more
14.01.2022 Small transformation done in wesburn after a sewer line went in. Fill brought in, 150mm rocks for driveway based, crushed rock for the driveway and finally 16tonne of coldstreams for defining new garden beds, reinforcing the culvert and line the driveway. #boral #pbjecobuilt #retainingwalls #excavation
14.01.2022 Just an average 3 days, 110m of fence supplied and installed, prefabbed n made spot on. Every post strsight, level and true. Even had to buy a coil gun to sort it out properly. #pbjecobuilt #excavation #retainingwalls #bitumill #goodclient
13.01.2022 Small 10m wall bowled over in 1 day. From setout to completion in 6 hours.
13.01.2022 Colourbond fencing completed at Berwick. Couple of drains n more topsoil to complete. Muddy puddles
12.01.2022 Transformation completed yesterday in kilsyth. 2 x sets of new stairs, deck removed, new walls, ground levels adjusted, water pipes installed, pits and drainage. Hapoy client and a great result.
12.01.2022 Little bit of fab work delivered to our client early this morning. 4m x 1.2m custom and painted made bench. Our fab guy has skillz. Onsite welding wont be available until mid august unless booked well in advance. #pbjecobuilt
12.01.2022 27 hole job underway,. 150 steel across the boundary run. 9m3 pour. #pbjecobuilt #excavation #retainingwalls #allwoodbuilders
12.01.2022 Fun job last week in donvale. 45m of walls including a stair kit. Rocky conditions and a new driveway meant slippin n sliding every which way. Charcoal plains for the clean look. Fence plates for a future fence. #excavation #retainingwalls #pbjecobuilt #newdevelopment
11.01.2022 Even on a sunday. Adding some racks so i can keep things tidy! Bfab on the job
11.01.2022 Breaking the 6 tonner in on warrandyte rock and a dragonfly on the arvo pour. #pbjecobuilt #excavation #warrandyte #croydonnorth #concretensteel
11.01.2022 New equipment feels. Traded the 3.8T in and took a 6T away. Twice the flow for quicker drilling and a rotating rock grapple on its way. Should make a big difference to efficiency. 6m of reach will be very handy. #pbjecobuilt #excavation #retainingwalls
10.01.2022 Heathmont wrapped up til front walls needed. 38 bored piers drilled n filled. Happy client. Yay!
09.01.2022 Another tight access one. This time lilydale. Big wall in a little spot. Lovely clients make it easy!
06.01.2022 Productive day yesterday. 175 sleepers installed in a day. Already backfilled and ready for the next step today.
05.01.2022 Koko brown modwood extreme going down at chirny. Fliplok system in use. Not too bad to lay with... eats screws tho... #pbjecobuilt #excavation #chirnsidepark
05.01.2022 Follow up on a bench frame we built. Client has sourced ex bridge timbers from NSW to finish off the bench. And now needs a few more benches Looks mint!
04.01.2022 Bowled over a 32m quick one with our angles at each end yesterday. Greasy! Put 1/4 bubble crank on the wall and 1400mm deep holes as it will be a driveway for heavy equipment. #retainingwalls #pbjecobuilt #excavation #2dayer #straightwithcrank #levelmuch #easternsleepers #easternminimix
02.01.2022 One of our stair kits infilled with concrete ready to use.
01.01.2022 Belgrave south project completed. Coldstream rock, stairs, retaining walls and our stairs. Concrete, shed slab and 8 wicking garden beds. Sad to see a massive gum tree have to come down but better safe than have it end up in their house.
01.01.2022 Final pour today at werribee. Lazy 49m3....
01.01.2022 Hey there everyone. As of today, we will not be doing any quoting on site. Its not that we dont want to, just a must do to remain compliant. If you have plans and pictures, we can quote off that. regards and stay safe - Paul.
Related searches
- AEB Services
Businesses Local service Business service Cargo and freight company
+61 411 214 812
225 likes