Precision Civil Infrastructure Pty Ltd in Springwood, New South Wales | Construction company
Precision Civil Infrastructure Pty Ltd
Locality: Springwood, New South Wales
Phone: +61 2 4751 6902
Address: Level 1, 155 Macquarie Rd 2777 Springwood, NSW, Australia
Website: http://www.precisionci.com.au
Likes: 137
Reviews
to load big map
25.01.2022 Completion of the Brierley Hills Estate SPS in Port Macquarie is not far away. Construction of 11m deep 2250 diameter SPS supplied by QMAX pumping systems in water charged grounds .
23.01.2022 http://au.prime7.yahoo.com//2024/mudges-25m-sewage-centre/
21.01.2022 Precision Civil Infrastructure have completed installing a new Sanitaire diffuser system supplied by Xylem ANZ. Removing the old damage tube diffuser system and replacing with all new header pipework and grid system consisting of 600 new Sanitaire disc type diffusers at Bathurst STP
16.01.2022 The Lake Cargelligo Reservoir
16.01.2022 JAS-ANZ Certification
13.01.2022 With Coates Hire sbh double slide rail on site we can now begin Excavations in water charged ground for the new VOLYM 3.8m precast SPS from Xylem ANZ
12.01.2022 Installation of a new QMAX DN2250 SPS and 200kL emergency storage tanks
12.01.2022 10m high switchboard structure at the new SPS site in Windsor
10.01.2022 The Cootha SPS in Dubbo has been completed and handed over to council
10.01.2022 Installation of the new Xylem Australia Volym SPS at Port Macquarie. This new design precast SPS has the equivalent capacity of a DN3800.
07.01.2022 Construction of the Junee Shire 7000EP STP servicing Junee township and Junee Correctional Centre is now complete. The STP consists of inlet works for flow reception, mechanical screening, grit removal, flow division to the new IDEA reactor and existing Pasveer Channel and emergency flow Bypass. The IDEA reactor incorporates a central decanting system, surface aeration system, wet well type submersible waste activated sludge (WAS) pump and WAS rising main to transfer waste activated sludge to the sludge lagoons and associated structures. Sludge from these lagoons are processed via the 2 new sludge drying beds. 100kWp grid-connected photovoltaic power generating system was also installed for the works.
05.01.2022 Construction of the STP currently being completed by PCI
05.01.2022 Lake Cargelligo Reservoir at final height
04.01.2022 New Mudgee Sewerage Treatment Plant TimeLapse
03.01.2022 Lake Cargelligo Reservoir
Related searches
- Coastal Garage Doors
Home improvement Garage door service
+61 416 266 254
22 Chestnut Avenue 2456 Coffs Harbour, NSW, Australia
59 likes
-
- Moora Concrete
Home improvement Construction company Concrete contractor
+61 8 9653 1888
196 Tootra Street 6510 Moora, WA, Australia
21 likes
- A CUT ABOVE tree and garden
Businesses Local service Home improvement Tree cutting service
+61 448 422 489
223 likes
- High Meadow New England
Home improvement Fence & gate contractor Producer
8601 Guyra Road 2365 Guyra, NSW, Australia
159 likes