Australia Free Web Directory

Pensar Infrastructure Group in South Brisbane, Queensland | Home improvement



Click/Tap
to load big map

Pensar Infrastructure Group

Locality: South Brisbane, Queensland

Phone: +61 7 3846 5922



Address: 8 Hockings St, South Brisbane 4101 South Brisbane, QLD, Australia

Website: https://pensar.com.au

Likes: 160

Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 Pensar was engaged by Banana Shire Council to increase the Moura Raw Water Pump Stations instantaneous flow. As part of the upgrade, Pensar was required to provide a solution for retrieving the pumps from the river during a Q100 flood without having to work over water. For more on the project > https://bit.ly/36G4lR4



25.01.2022 Over the past 20 years, Pensar has evolved and scaled to become the multidisciplinary infrastructure provider we see today. Since its inception in 2000, the business has focused on developing a high performing team with the drive to deliver quality community infrastructure. Over the course of those two decades the Pensar Team has delivered numerous projects, shared in many victories and established an enviable company culture. This journey has not come without its challenges ...and learnings but its the surviving and thriving that has set us up as a business that will stand the test of time. Check out our 20 year site to learn more about the Pensar journey > http://bit.ly/3aQiHPr

25.01.2022 Pensar recently completed a clarifier refurbishment at Image Flat Water Treatment Plant, improving overall water quality. The project involved a 10 week shutdown of the plant to complete design, refurbishment works and final installation and commissioning.

24.01.2022 Today 24 February 2020 is a celebratory milestone for Pensar: it marks the day, 20 years ago when our vision first came to fruition. Learn More > http://bit.ly/32kl1LH



23.01.2022 The Molendinar Water Treatment Plant is the largest treatment plant on the Gold Coast, servicing the majority of the region. Seqwater engaged Pensar for the upgrade of the backwash and electrical systems. To share what we learnt during the delivery of this project weve created a technical overview covering the materials used, whats involved in managing a 10-week shutdown, how we used 3D modelling to improve the design and more. View the Technical Overview > https://bit.ly/2YFTbIr

23.01.2022 Pensar has several years’ of experience in the design and delivery of water infrastructure. We have the capability to self perform reservoir projects, offering clients a safe, efficient and tightly controlled program - minimising costs and seamlessly meeting delivery objectives.

23.01.2022 Pensar was commissioned to replace damaged navigation beacons in the Brisbane River and to complete alterations and refurbishments of redundant Sarus Towers stored at the MSQ Depot. For more on the project > https://bit.ly/3544DSP



23.01.2022 Pensar is a client focused business. We take pride in the diversity and quality of projects we deliver and the people we deliver them for. Our teams are committed to building trusted, enduring relationships with every client and its these long lasting relationships that have enabled Pensar to establish and grow successfully for the past 20 years.

23.01.2022 Pensar was contracted for the expansion of the Branyan Water Treatment Plant. The project involved the design and construction of a 5ML Clear Water Storage tank and a 0.5ML Powdered Activated Carbon tank, the associated underground pipework network and SCADA process design and integration. The new infrastructure will increase the water storage capacity and improve water quality.

23.01.2022 Pensar is looking for a Project Engineer to join our team. With a positive and collaborative work culture, Pensar comprises a close-knit team of diversely experienced, highly committed people. We are committed to providing our people with the opportunity and support to build their careers. Learn More > https://bit.ly/2YO64zV

22.01.2022 Pensar offers clients a single multidisciplinary team of technical experts, working to one set of standards and level of performance. Our integrated group provides holistic solutions, with the singular perspective that whatever a project entails we have the collective expertise to deliver the solution.

22.01.2022 As we celebrate 20 years, Karl reflects on his personal journey of founding Pensar, the growth and challenges and our plans for the future.



21.01.2022 Happy International Women in Engineering Day! We are proud of the talented female engineers who are part of the Pensar team, helping to #ShapeTheWorld and inspiring others to consider a career in engineering. Today is an opportunity to raise the profile of female engineers - tag someone below to recognise them this #INWED20

21.01.2022 The Infrastructure People. Our passion to improve infrastructure filters through our people and equally inspires our clients as we work together towards creating infrastructure that makes a better way of life possible for families, businesses and industries.

20.01.2022 Today is the start of National Reconciliation Week. This year marks twenty years of shaping Australias journey towards a more just, equitable and reconciled nation. Pensar is in the early stages of its Reconciliation journey and has recently submitted its REFLECT Workplace Reconciliation Action Plan. This RAP represents our commitment to operating in a culturally responsive manner, promoting the values of reconciliation amongst our people and reflecting this through the work we deliver for clients and the community. #NRW2020 #InThisTogether2020 Reconciliation Australia

19.01.2022 Pensar installed a new backwash handling system at Dunwich WTP, improving the environmental performance of the plant. The new system captures all backwash water, ensuring it does not enter waterways.

19.01.2022 Pensar was engaged for the upgrade of the Kangaroo Point Bikeway. The project increased the safety of cyclists and pedestrians and was critical to BCCs long-term commitment to bikeway network improvements. For more on the project > https://bit.ly/2MxaTs0

18.01.2022 The Yeerongpilly Greens Parkland Development was an infrastructure commitment for the provision of parks and public space as part of the urban renewal precinct at Yeerongpilly. Pensar was involved in the delivery of Stage 1 and 2 of the development. In the delivery of this project, the Pensar team installed 21km of conduit, 256 electrical and comms pits and 205 feature lights. For more on the project > https://bit.ly/3eZVQmk

17.01.2022 Pensar is looking for an Estimator to join our team. With a positive and collaborative work culture, Pensar comprises a close-knit team of diversely experienced, highly committed people. We are committed to providing our people with the opportunity and support to build their careers. Learn More > https://bit.ly/2zq4Vpn

17.01.2022 Pensar was engaged for the Fitzroy River protection works & construction of fishing platforms. The project repaired the heavily scoured areas of the Fitzroy River and Gavial Creek, in preparation for the construction of the South Rockhampton Flood Levee. For more on the project > https://bit.ly/2Crl003

16.01.2022 Pensar was engaged to upgrade the Noosa Water Treatment Plant to ensure safe and reliable treatment of water from the Mary River and Lake MacDonald. For more on the project > http://bit.ly/2Q5UsVv

16.01.2022 To address key defects, issues and minimise environmental and safety risks Pensar was engaged for the upgrade of existing QUU Sewer Pump Stations. The upgrades will improve the reliability of the pump stations and extends the service life of the assets. For more on the project > https://bit.ly/3aKy0sH

15.01.2022 Pensar Site Engineer, Ivette Nino, was recently featured on Top 100 Women as their Woman of the Week. Ivette shares what she most enjoys about the construction industry, what skills shes developed to get to where she is today and her plans for the future. Read Ivettes story > https://bit.ly/2VyNXhn

14.01.2022 Pensar delivers concrete maintenance to major refurbishments throughout metropolitan and regional areas, extending the service life of assets. Our team of technical experts are trained in the repair of concrete and application of carefully selected products to meet the remediation needs of a range of clients. Pensar customises its approach for individual project needs ensuring we only use leading edge remediation and protection solutions to deliver the best result for every client.

13.01.2022 The Stanage Bay Boat Ramp and Floating Walkway Project was part of a $30 million Government commitment to marine infrastructure. Stanage Bay is the gateway to some of the Capricorn Coasts most sought after fishing locations. The project delivers better facilities for anglers and is likely to generate an economic boost for the local area. For more on the project > https://bit.ly/3g8jddW

12.01.2022 As part of an ongoing panel arrangement with Brisbane City Council, Pensar has completed more than 150 minor works jobs to repair or replace damaged traffic signal assets across Brisbane. Learn More > http://bit.ly/39yCpyu

12.01.2022 To mitigate concrete deterioration and extend the service life of the asset, McKinlay Shire Council have engaged Pensar for the refurbishment of the Julia Creek Water Tower. The scope involves external concrete repairs & waterproof linings, internal protective coatings, upgrades to pipework, control valves, ladders & landings and the implementation of a heights safety system. The project will improve security of water supply, ensure the tower meets current Australian Standards and reduce future repair costs.

11.01.2022 As Pensar approaches its 20 years milestone, Founder and Managing Director Karl Yunker reflects on the companys successes and how building a strong workplace culture, centered around its family roots, has contributed to our ongoing business operations. Read Article > http://bit.ly/38bOIjA

11.01.2022 The switchboard at the Home of the Arts Centre (HOTA), on the Gold Coast, was approximately 30 years old and reaching the end of its service life. The Gold Coast City Council engaged Pensar for the complete replacement of the existing switchboard. For more on the project > http://bit.ly/2TZGg2Y

09.01.2022 Pensar was engaged for the construction of the Brisbane International Cruise Terminal. This mega-cruise ship terminal will allow Brisbane to accommodate cruise vessels of all sizes, including the largest ocean-going cruise ships in the world. For more on the project > https://bit.ly/35oZJ35

07.01.2022 Pensar has several years of experience in the design and delivery of water infrastructure. We have the capability to self perform reservoir projects, offering clients a safe, efficient and tightly controlled program - minimising costs and seamlessly meeting delivery objectives.

05.01.2022 The Mt Crosby East and West Bank Water Treatment Plants have a combined capacity of 1000ML/day and are a major source of drinking water for the SEQ region. This project upgraded the fluoride dosing system to deliver improved robustness and reliability. Learn More > http://bit.ly/36FkoN6

05.01.2022 Over the past 20 years Pensar has grown from a civil and subdivision focused business to a highly technical, multidisciplinary infrastructure provider specialising in Utilities, Marine and Maintenance. Innovation is at the core of everything we do. Our teams are encouraged to approach projects differently today than they did yesterday and this out of the box thinking is what has gotten us to where we are. Watch Video > https://wi.st/2yFO0iq

04.01.2022 Last week Pensars HSEQ Manager Daryl Curran presented at the Queensland Major Contractors Association (QMCA)s Networking Breakfast. Daryl spoke of Pensars health and wellbeing program and the positive effect it has had on our people, our safety record and the overall company culture.

03.01.2022 Three reservoirs, constructed in the 1920s and 30s, were experiencing significant water loss through the wall and floor expansion joints. Pensar was engaged by Hunter Water for the refurbishment of one above ground and two partially buried reservoirs. For more on the project > https://bit.ly/3dPTu8O

02.01.2022 The Alpine Shire Council engaged Pensar for the complete upgrade of an existing bridge in Myrtleford. The upgrade increased the load limit to safely accommodate heavy vehicles. For more on the project > https://bit.ly/2AH71Ss

02.01.2022 The Days Rd and Kedron Brook Rd Upgrade required the replacement of the existing roundabout with a signalised intersection and pedestrian crossings to improve traffic efficiency and increase safety for all road users. For more on the project > http://bit.ly/2VhL70v

01.01.2022 The Herston Quarter Redevelopment involved a major intersection upgrade which required the design of new sewer and water infrastructure, identification of major optic fibre network carriers and the identification and potential relocation of the trunk network gas main. For more on the project > https://bit.ly/2QLsJK2

Related searches