Australia Free Web Directory

Platypus Environmental Services | Environmental service



Click/Tap
to load big map

Platypus Environmental Services



Reviews

Add review



Tags

Click/Tap
to load big map

24.01.2022 This Wetland rectification project by Platypus crews in Epping is nearing completion. Rock embankment reinstatement works and aquatic plantings are now completed, improving wetland functionality and flow #wetlands #wsud #revegetation #rockembankment #environmental #restoration #waterquality #platypusenvironmental #nrm #civilenvironmental #rockworks #spillway #aquatichabitat



24.01.2022 We have a great opportunity for a bookkeeper to join the team at Platypus Environmental Services. For more details, please see the link below: https://www.seek.com.au/job/51125616

23.01.2022 We have just completed our last revegetation project for the season, up along the Campaspe River. These plantings will establish critical riparian habitat and manage flows and nutrient levels along the river following the removal of Willows.

23.01.2022 Platypus crews undertaking revegetation works to establish riparian corridor, after willow removal works along the Yarra River #riverrestoration #revegetation #yarrariver #wesburn #melbournewater #nrm



22.01.2022 R U OK Day 2019, Team Platypus . A conversation could change a life. #ruokday #platypusenvironmental

21.01.2022 Platypus crews undertaking pest monitoring works, looking for evidence of fox and rabbit activity amongst significant wetlands across Melbourne #nrm #pestmonitoring #protectnativewildlife #fox #rabbit #pestanimals #environmentalservices #conservation #wildlifeconservation

21.01.2022 This week we began large scale willow removal works along the Yarra River, up in the Yarra Valley. Looking forward to follow up revegetation of indigenous species and hoping to see plenty more Platypus in this section of the river in the future :) #yarrariver #riverhealth #woodyweedremoval #riverrestoration #healthywaterways #environmental #platypusenvironmental #volvoexcavator #conservation @ Woori Yallock, Victoria



21.01.2022 Campaspe willow removal - multiple booms make light work #campasperiver #nrm #volvoce #willowremoval

20.01.2022 Platypus tree removal crews undertaking large scale Pine Removal works at Garfield. Over 180 Tonne of logs have been removed from site to be used for furniture timber #woodyweedremoval #environmentalworks #treeremoval #platypusenvironmental #stumpgrinder #pineremoval @ Garfield, Victoria

19.01.2022 One of our recent collaborations, great to see it appreciated

14.01.2022 A day up with the tree ferns doing some trackside weed control #nrm #weedcontrol #dandenongranges #restoration #environmentalservices

14.01.2022 Great day for tackling woody weeds up on Lerderderg River #nrm #riverrestoration #weedmanagement #lederderg #ecology #environmentalmanagement #platypusenvironmental #blackwood #seevictoria



13.01.2022 Proud to be part of this project - working on healthy waterways

10.01.2022 Wetland remediation works - We've recently completed resetting a rock embankment and created some pedestrian access to feed the #nrm #wetland #rockwork #melbournewater @ Epping, Victoria, Australia

09.01.2022 Our specialist tree crews have been out treating and chipping exotic woody weeds throughout Coastal Saltmarsh Habitat #platypusenvironmental #woodyweeds #restoration #environmentalwork #chipping #rayco #treeremoval

03.01.2022 This week Platypus took delivery of our new HG6000tx Vermeer Horizontal Grinder. It makes light work of our large willow stockpiles removed from the Yarra River in Woori Yallock for Melbourne Water. Capable of processing up to 300m3/hour and with a 1524mmx813mm infeed this 755Hp beast has also made the worksite safer being fully remotely operated from the excavator. We would like to take the opportunity to thank Vermeer Australia for their exceptional service and Vic Low Lo...aders for picking it up from Brisbane Vermeer Australia RDO Equipment Pty Ltd Vic Low Loaders Melbourne Water

03.01.2022 Revegetation works along the Campaspe River on a perfect Spring day, following on from extensive Willow removal works #campasperiver #platypusenvironmental #revegetation #riverrestoration #caringforthecampaspe #nccma #waterways #environmental

02.01.2022 Before and after of some drainage works in Koo Wee Rup - our team conducted tree removal and desilting to improve flows - essential works to prevent flooding

Related searches