Australia Free Web Directory

Ploughman Excavations | Demolition & excavation company



Click/Tap
to load big map

Ploughman Excavations

Phone: +61 418 350 125



Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 We’ve just launched our Instagram page! If you’d like to see more of what we get up to, click the link below to follow us. https://www.instagram.com/ploughman_excavations/



25.01.2022 Over the past few weeks we have been part of a large rock placement project taking place in Narre Warren North. Due to the size and weight of the rocks utilised we required an additional larger excavator and grab to safely and efficiently complete the works. Over the course of the project we have captured some footage which has been complied into the following timelapse.

25.01.2022 Today we finished up a project that we’ve been a part of at Kangaroo Ground and we’re thrilled with the final result. The project involved a diverse range of tasks including site cut/fill, wall construction, soil importation, turf preparation and turf installation.

24.01.2022 We’re very pleased with the result of this carpark and pathway refurbishment completed today in Shoreham. With over 100 cubic meters of crushed rock imported, spread and compacted, this site is looking fresh and rejuvenated.



21.01.2022 Earlier today we finished up some lawn area refurbishment works in Blackburn South. Badly pitted and some spots barren of any growth, this 1200 square meter area was in a state of disrepair. To remedy the situation, we imported and spread multiple loads of topsoil before hydroseeding with a blend of grass varieties that will be both hard wearing and aesthetically pleasing. A high quality outcome and cost effective solution delivered in a safe and time efficient manner. ... We can’t wait to see the end results in a few months time! Think we can help with your next project? Visit www.ploughmanexcavations.com.au for more information.

21.01.2022 We’ve spent the past couple of weeks in Toorak taking part in remedial structural works next to a new swimming pool. Site access has been very limited however we have improvised and adapted to achieve outcomes for all involved.

18.01.2022 It was great to get an opportunity to try out our brand new auger drilling 450mm x 2.5 meter deep bored piers in Ringwood today. Thank you to Sean from G-TEC Attachments for getting everything setup for us.



14.01.2022 One thing we always take pride in, is keeping our site tidy. Attention to detail is the key

14.01.2022 Footage from the crane lift today placing a small 1 ton excavator into the excavation.

11.01.2022 A bit of excitement and positivity this morning as we took delivery of our brand new Bobcat E35 excavator, replacing our previous machine. As always the level of support, backup and friendship from Clark Equipment Dandenong plays a vital role in continually evolving and strengthening our business. We can’t wait to put it straight to work this week! ... Clark Equipment Australia Bobcat Australia

09.01.2022 Today we completed this minor excavation and preparation in Blackburn South. Determining levels, excavating to grade and installing class 3-20mm crushed rock ready for new driveway, footpath and artificial turf areas all while protecting the existing driveway and brick edging before cleaning our work area leaving the site as we found it. It doesn’t matter how big or small your project is, we always maintain our rigorous standards of safety, quality and professionalism. ... If you think we can assist you on your next project or for more information about our services visit: www.ploughmanexcavations.com.au

06.01.2022 Today out at Kangaroo Ground we put our newest attachment to the test, a sleeper grab, using it to construct a retainer wall with recycled railway sleepers. What was once a labor intensive and time consuming task is now both efficient and significantly safer, with a high reduction to the risk posed by manual handling.



04.01.2022 Another swimming pool excavation completed. The swimming pool to be installed will be fibreglass. Working to exacting levels and measurements , will make the installation process more effective

01.01.2022 Today we finished up a project in Hawthorn that we’ve been working on for the past few weeks. It’s been a diverse job involving multiple aspects including, general site trimming, drainage work, hole drilling, rock placement and the importation and spreading of sand, toppings, soil and mulch, all while contending with difficult terrain and a broad spectrum of weather conditions. A great project to be a part of and a great way to finish the week!

Related searches