Pool Fx in Gold Coast, Queensland | Local business
Pool Fx
Locality: Gold Coast, Queensland
Phone: +61 7 5530 7204
Address: Gold Coast 4213 Gold Coast, QLD, Australia
Website: http://www.poolfx.com.au
Likes: 263
Reviews
to load big map
25.01.2022 Large pool with false infinity edge on main river this keeps the cost down but still creates the desired wet egde look. The coping tile was style egded to match surrounds and this achieved a visual flow through out the entire outdoor area.
25.01.2022 What a mess, thanks for helping out with the pool dig. By the way bring the dirt back so we can install the 18 screw piers in the pool cannot reach them now,
25.01.2022 Mobile office while we wait for the shell concrete to cure and yes the boss is fishing and working at the same time.
24.01.2022 Who said access was a issue
24.01.2022 Pool tiling well underway with the light grey granite coping 600 x 600 x 20 mm. Another day tomorrow will have it all laid. Big tiles means a sore back though.
24.01.2022 Installed a lid so the builder can work. See you when the house is done.
23.01.2022 Well big day in the North with the pool sprayed today. Big effort by all to make it happen
21.01.2022 Mudgeeraba pool construction This is how it all gets started with a Pool FX sign
19.01.2022 Best to install pool first when you have no room to get it done later. This allowed us to be close to the boundary.
19.01.2022 New pool going in up Tallebudgera Valley, this is the boys spraying in the SprayCrete.
18.01.2022 Putting a style edge and ceramic mosaic on one pool and the final touches to another this week
18.01.2022 Mudgeeraba pool construction, pebble interior just completed with a acid wash and now the waters going in. Two hoses will make it happen quickly
17.01.2022 Site prepared for Pool Fx by the owner who fortunately has their own excavation company Agnes Excavations
17.01.2022 Spray day always a good day and this view is something else.
16.01.2022 20m3 concrete in about 5m3 to go
16.01.2022 Things just become a little slower and louder with Warrick on the new Hammer Agnes Excavations. We’ll get there in a day or two.
15.01.2022 Back at it today with the waterline mosaic being installed. Rendering first then the mosaics with kemgrip super glue used for maximum strength. White mosaics from The Pool Tile Company will give the pool a crisp look once the water is in and it makes it easy to keep the waterline clean.
14.01.2022 Always a good day when we finally fill and start up. Main river Chevron island.
13.01.2022 Glass mosaic Tiling and custom edging on surround coping to match body tiles.
12.01.2022 Starting something new up in the hinterland. Building a pool in the location where the land is unusable to create a great new space.
12.01.2022 Pool just started up with the pebble color C10 used and the white mosaic tiles on the top of the coping on the outer edge. How’s the view
10.01.2022 Well all done for now with all the tiling completed and filtration installed. 12.7 x 4.2 m main pool area with two swim out ledges 600 wide and 3.9 length. One with spa jets and deck jets and fully tiled ledge for a softer sitting area. Two Quad skimmer kits to match coping stone which is a light grey granite from The Pool Tile Company It’s matches up well with white ceramic waterline tiles. It going to be a great space with the turf going to come up to the 600 x 600 coping. Pebble next
09.01.2022 Team work, it was a long way around this pool but the final touch is so important. All ready for pebble in a couple of weeks time. Fencing now needs to be completed and a Form 17 compliance certificate issued and we are ready to complete.
09.01.2022 The boss sprayed Concrete for three years before he started Pool FX in 1996 and he still can’t resist getting in to help out.
08.01.2022 With the Excavation finally finished and the drainage gravel in the reinforcing steel work begins. Bit of size in this pool.
07.01.2022 Pool fence going in and getting close to finishing the tile work. Just a final inspection before we can fill
05.01.2022 The boss man himself keeping a very close eye on the tradies.
05.01.2022 All set up for the concrete spray, the boys waiting patiently for concrete.
05.01.2022 Pool FX has the expertise to take on the projects where others cannot. This Pool requires some extreme footings, it’s all in the preparation, set it up right and end up right. Pool construction in Springbrook location. Another spectacular view for this Lap pool
05.01.2022 And it’s sprayed big effort from all the boys today. Strip boxing tomorrow and let the concrete cure before we start tiling.
04.01.2022 Pool in Springbrook really starting to take shape with the footing in and formwork completed. Steel placement done. Looking forward to the concrete spray.
03.01.2022 Another new project coming out of the ground in Mudgeeraba. A very steep site which requires additional detail.
03.01.2022 Steelfixing done ready for 32 mpa concrete
03.01.2022 Cleaning up around the pool area and setting the bedding height for pool coping. This will allow for the concrete pool surrounding to be poured level with the pool bed, giving a seamless edge to the pool surrounds. Pouring concrete surrounds on Monday
02.01.2022 Site office and accommodation all set up, now let’s get this pool dug.
01.01.2022 Ashgrove pool shell almost done, structural pool on bored piers. Limited access to get the pool in.
01.01.2022 The owners also made the decision to pick up plumbing, filtration and tile supplies from Brisbane themselves to save on big freight costs.