24.01.2022 Intricate cabling project undertaken by Power On Q's team of committed, dedicated and specialised staff, whom have all the appropriate qualifications to ensure all your 'Power Related Services' are addressed successfully, on-time and within budget.
23.01.2022 Complete Power System, 3 DC Output voltages, Batteries, alarms, fuse fail on all 3 voltages, 2 different earthing arrangements, and a WAIO compliant enclosure.
23.01.2022 Not just a pretty face...
23.01.2022 LAGA PROJECT SUCCESS Boyd Lockett, Power On Q CEO stated in a recent press release We were initially presented with a major power problem (Up to 5 power outages every day) affecting the daily operation of the largest cannery in PNG from Laga Industries. Power On Q in conjunction with Power On Australia, worked side-by-side with Laga to design a suitable solution for the mine site, which we all affectionately named Power In A Box. Incorporated into this solution was a ... 275KVA UPS, PFC, Surge Protection, VSD Drives and a Switchboard all in a standalone, plug and play solution, built in a shipping container and sea freighted to PNG for immediate use. The end user customer was extremely content with the final solution provided and installation and since this initial prototype concept was installed, several more are now on the table to be built over the next couple of years.
20.01.2022 A Tough One. A mine site needed an extremely Hardy Power System, that could put out both AC and DC power, for a minimum of 4 hours, to support it's switchroom. It also had to be compliant with all the Mine site Power Standards including Earth Leakage detection, be supplied from a 3 phase 3 wire no neutral source, and not be affected by higher than average temperatures. Job Done.
18.01.2022 Power On Q was contracted by ABB Australia Pty Ltd to work with them in designing a power protection solution to meet the needs of the Anglo Grosvenor Mine Site in Queensland. It was evident that there were various power requirements around the site and as such Power On Q was presented with the scope of coming up with a consistent solution to be installed in all the switch rooms on the mine site, in order to provide one type of system to understand for ease of maintenance in... the future. The initial design included an 11kVA modular UPS Unit, Extended Battery Cabinets, an Electromechanical Bypass Switch, a Load Centre and PDU, all housed in a suitable data cabinet. Once this design was approved, Power On Q provided the supply, project management, factory testing and commissioning to ensure the roll out of the total turnkey solution was successful. Since the pilot project was completed, a further 11 configurations have been rolled out across the site. See more
14.01.2022 No matter how you assess it, downtime of our electronic equipment carries an enormous price tage with it - and it may come as a surprise to you but ... most of the downtime events stem from a preventative cause. Power On has a wide range of New Equipment Services and Maintenance of Existing Equipment Services available. NO MATTER WHAT YOUR NEEDS ... Power On Q will have the answer to keep your equipment 'POWERING ON' !!
06.01.2022 The Brief... A Singaporean Company who,s Client was based in the US required a final solution and installation into the Highlands of PNG . Scope...... The solution needs to fit inside a confined space of no higher than 620 MM. It has to provide changeover and backup loads during generator start up /shut downs during load transfer to Prime Generator Mains. The location... The remote Jungles of the Png Highlands for Key Telecommunication Towers . The solution... Input 12 v @ 6o amps load putting out 24 Dc. Timeframe... 2 weeks to build and factory test from receiving components from overseas. The result... Power On Q Designed built and Factory Engineered and Tested within Two weeks. All within a custom Designed 12 Ru cabinet with Eyelets for Bracing during possible Png earthquakes. On budget On time and totally customised to suit site environmental conditions.