Australia Free Web Directory

PEMS in Springfield | Construction company



Click/Tap
to load big map

PEMS

Locality: Springfield

Phone: +61 431 496 643



Address: 1 Commercial Drive Qld 4300 Springfield, QLD, Australia

Website: https://www.pems-au.com

Likes: 148

Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 We have just gone live on Instagram everybody! Check us out! https://www.instagram.com/pemsau/



25.01.2022 PEMS has just completed engineering design and details drafting of 2x Oil Tank personnel access towers, PEMS also offered fabrication of the towers and were successful. Fabrication is now underway with delivery to site scheduled 14th July.

25.01.2022 Trial assembly well underway for 2 x Oil Tank Access Towers

22.01.2022 API 650 ULP Tank design currently underway, PEMS engaged to complete full design and detailed drawings of the Tank and associated process connections. Contact PEMS for all your engineering needs, Civil, Mechanical Structural and Electrical



22.01.2022 PEMS attends the Perth AOG exhibition 2019 some photos of the stand shared with CMP Fibalite for pipe and pipeline rehabilitation and repair technology #Engineering #Procurement #Construction #Maintenance

22.01.2022 PEMS orbital welding setup Contact PEMS for your high quality orbital welding needs

21.01.2022 PEMS now offers pipeline repairs for pipe wall thickness loss, our partners CMP Fibalite, Nederland's have a composite wrap that has been tested under the supervision of DNV-GL, 150NB SCH 80 pipe with material loss of 80%, wrapped and pressured tested to 686Barg, no defects to the composite wrap and pipe rupturing at 686Barg. Hot works has inherent risks, remove these risks utilising this composite wrap material. Tests completed in accordance with ISO 24817:2017 Type A Defect.



21.01.2022 PEMS Vietnam Engineering Team night out on successful completion of design package

20.01.2022 Fun fact #01. Did you know that the word engineer comes from the Latin derivative meaning "cleverness"? Don't let our heads get too big!

20.01.2022 PEMS continues to provide its clients with quality fabrications

19.01.2022 We have exciting news from the team at PEMS! We're jumping on all the popular social media platforms, so keep an eye out for us and give us a share! Happy Wednesday!

19.01.2022 PEMS Integrated Management Systems (IMS) Update May 2017 PEMS on the 25 May 2017 has been awarded triple certification by Bureau Veritas Certification.



17.01.2022 Access Towers 1 & 2 galvanising has been completed now for pre-assembly and shipping

17.01.2022 Finished welding of the huge flange ready for PWHT

14.01.2022 Loading out for Noumea

14.01.2022 PEMS progressing with pressure vessel concept design, design code AS1210

13.01.2022 PEMS has recently completed pressure vessel designs to ASME VIII Div 2 for vessels operating in excess of 240 Bar, PVElite was used to complete all vessel calculations and from the PVElite calculations 3D Models and detailed fabrication drawings where established. Now to progress to fabrication and supply Contact PEMS for all your vessel, piping, tank designs and fabrication requirements. www.pems-au.com

13.01.2022 We've hit 100+ likes already! Thanks so much for all the support from all of us at PEMS, it warms our hearts!

13.01.2022 3D Model for tank platform structures underway photos show 1 tank project is 2 tanks and platforms interconnected by bridge structure

11.01.2022 3D Model final design and fabrication to follow

10.01.2022 Precise welds every time #Orbital #Welding

10.01.2022 A little insight into what we do. Keep an eye on this space

07.01.2022 PEMS continues to supply quality fabrications, contact PEMS for any fabrication needs, no job to big or small. Structural, Piping, Vessels and Skids all fabricated to our systems and procedures certified to ISO 9001.

06.01.2022 PEMS Vietnam Office providing complete EPC services globally

06.01.2022 Access towers finally installed onsite

05.01.2022 Happy weekend everybody! Enjoy the nice sun out there while it lasts! Rain is forecast for a few drizzly movie days under the couch. We'll be back bright and early on Monday!

04.01.2022 Now this is what you call a pipe FLANGE

03.01.2022 Happy Monday Facebook Family. Keep those spirits up and those faces smiling. Here's a little comic to give you a giggle!

02.01.2022 Steam condensing platform fabrication underway PEMS completed design and detailed drawings Works completed in PEMS fabrication workshop

02.01.2022 Trial fit of Tank Platforms underway delivery to PNG scheduled end of July

02.01.2022 PEMS providing engineering support on a Green Energy Project

01.01.2022 PEMS has been engaged to complete 3D modelling, detailed drafting, and fabrication of 2x tank platforms. Deliveries are due end of June to a large mine site in Papua New Guinea

Related searches