Redcliffe Qld Community | Community
Redcliffe Qld Community
Reviews
to load big map
22.01.2022 It’s fire time Followed by yummy food and lots of laughs. That’s our #teppanyaki #brisbaneteppanyaki #supportsmallbusiness
19.01.2022 FLASHBACK: The bridge that changed life in South East Queensland. 85-years-ago today the Hornibrook Highway connected Brisbane and Redcliffe. A day trip would never be the same again. www.7NEWS.com.au #Flashback #7NEWS
17.01.2022 Best Of Local Moreton Bay - July Edition, your community magazine is out online today on the Redcliffe Qld community website - http://redcliffeqld.com.au/
16.01.2022 Moreton Bay is a great place to live, work and play! Read the June edition of Best Of Local Moreton Bay Magazine online today.
15.01.2022 BREAKING: Queensland Premier Annastacia Palascszuk announces border with Victoria will remain closed, with tougher restrictions to be implemented. Queensland’s ...border with other states will open on July 10. "From July 10 people will be allowed to travel into Queensland after filling in a border declaration. This border declaration will ensure that no one has travelled to Victoria in the past 14 days." www.7NEWS.com.au #7NEWS
14.01.2022 Notice the green moss on outer shell? Super fresh oysters We are open 7 days lunch & dinner #freshas #supportlocalbusiness
13.01.2022 Good to see $26M for civic infrastructure.
11.01.2022 How lucky are we to have winter days like this? Come and enjoy this view when you dine with us. We are open 7 days lunch & dinner. 32035744
10.01.2022 Today I seconded a motion, awarding a $234,200 contract for the overhaul of the Redcliffe War Memorial Swimming Pool. The facility is home to three pools, the ...50 metre Olympic-size pool, a 18.3 metre Learn to Swim Pool and a Baby Wading Pool. All three have deteriorated due to their age and use. Work will start in the coming weeks with completion targeted for early September 2020 - Detailed info below - The 50 metre Olympic-size pool consists of a paint applied floor and tiles around the sides. The floor has deteriorated due to age and as such the substrate is now visible from the surface of the pool. Tiles around the pool have been damaged and the grouting has eroded. As part of this project, the pool floor will be stripped and recoated with applied epoxy. Damaged tiles will be replaced, and all tiles will benefit from the reapplication of grouting. The 18.3 metre Learn to Swim Pool is approximately 18.3m by 11m and is tiled on both the floor and sides. Tiles around the pool have been damaged and grouting eroded. The parent waiting area has also deteriorated significantly due to age. As part of this project, al damaged and missing tiles will be replaced, and all tiles will benefit from the reapplication of grouting. The existing artwork will be stripped back and reapplied under a similar design. The Baby Wading Pool is approximately 7.9m by 7.8m and is tiled on both the floor and sides. Like the 50m and 18.3m pools, tiles have sustained damage and require replacement. As part of this project, all damaged and missing tiles will be replaced. The existing non-slip painted border will be repainted as part of this project. Due to the age of the facility, all expansion joints have deteriorated and are believed to no longer be capable of preventing water ingress or completing their purpose. As part of this project, all expansion joints on the concourse and in the pool will be renewed and sealed to prevent further deterioration.
07.01.2022 Redcliffe Dolphins are getting creative and boosting their position in the Moreton Bay Region.
07.01.2022 The Redcliffe Art Gallery opens this weekend! Read all about it in this months Best Of Local Moreton Bay - http://redcliffeqld.com.au/community-magazine/
04.01.2022 TOP PRIORITY FOR IMMEDIATE BROADCAST Severe Thunderstorm Warning - Southeast Queensland for DAMAGING WINDS and HEAVY RAINFALL For people in parts of Ipswich, Logan, Somerset, Scenic Rim, Lockyer Valley, Redland City, Sunshine Coast, Brisbane City and Moreton Bay Council Areas.... Issued at 3:44 pm Tuesday, 27 October 2020. Plan Image The Bureau of Meteorology warns that, at 3:40 pm, severe thunderstorms were detected on the weather radar near Boonah, Laidley, Gatton, Caboolture and Dunwich. They are forecast to affect Strathpine, Redcliffe and the area south of Esk by 4:10 pm and Beaudesert, northern Moreton Bay and waters off Bribie Island by 4:40 pm. Damaging winds and heavy rainfall that may lead to flash flooding are likely. 48mm was recorded at Kalbar in an hour. 62mm was recorded at Helidon in an hour. 70mm was recorded at Upper Lockyer in an hour (57mm in 30 minutes) Queensland Fire and Emergency Services advises that people should: * Move your car under cover or away from trees. * Secure loose outdoor items. * Never drive, walk or ride through flood waters. If it's flooded, forget it. * Seek shelter, preferably indoors and never under trees. * Avoid using the telephone during a thunderstorm. * Beware of fallen trees and powerlines. * For emergency assistance contact the SES on 132 500.
02.01.2022 Telling someone you're thinking of them is A-OK
01.01.2022 It's almost Friday peeps!! Have you read this months Best Of Local Moreton Bay?? Read it online - http://redcliffeqld.com.au/ Happy Thursday.