25.01.2022 Front decks insulated roofing panels on. Vanities &wm wc's started. Friday arvo's sunset over the awesome Maroochy River.
25.01.2022 Awesome exposed aggregate pool coping detail to go with an even better pool view.
23.01.2022 Ground slab poured for residences 9 to 15 on Friday. Pool shell poured Wednesday.
22.01.2022 Building 2 second level wall frames up & Building 1 pour A prepared ready for pouring next week.
22.01.2022 Building 2 ground floor wall frames built this week. 12 out of 15 sold.
21.01.2022 Front landscaping done. Marketing shade cloth removed
21.01.2022 Back building with scaffold removed. Still lots to do inside.
21.01.2022 Frameless glazed pool fence and entry gates/portals in. Only 1 unit left in the back block and 1 of the waterfront residences to sell.
21.01.2022 Recent aerial shot
18.01.2022 Cladding continues on the rear building
18.01.2022 Pool design/construction will be good for relaxing and a swim with a view. 11 out of 15 sold.
18.01.2022 Rear balustrade is on building 2
17.01.2022 Front building balustrades on and exground livistonia street trees are in
16.01.2022 Top level painted and scaffold removed
16.01.2022 Nearly time to breakout your togs ... Pool pebblecreted and nearly full of water
15.01.2022 Front decks insulated roofing panels on. Vanities &wm wcs started. Friday arvos sunset over the awesome Maroochy River.
14.01.2022 Front courtyards turfed and plants in
14.01.2022 Aerial shot of riverland out to the coast
12.01.2022 Units 1 to 8 ground floor slab poured and walls erected
12.01.2022 Scaffold coming down on rear elevation & Stairs going in the rear building
12.01.2022 Roof on rear building. Top level of front building walls well advanced.
11.01.2022 A bit more landscaping and some the natural pearl flooring going in.
11.01.2022 Plasterboard linings commenced on rear building. Some paint & colour on the top and sides externally also.
11.01.2022 Site fence down.
11.01.2022 Stone bench tops in first two kitchens.
10.01.2022 First section of internal driveway poured
10.01.2022 Front and side retaining walls in. civil & rear building drainage in
07.01.2022 Front courtyard entrance stairs and paths poured. Another section of driveway poured. Showerscreens tapware going in.
07.01.2022 Entry signage up, plus internals ready for first clean
06.01.2022 Western retaining wall built. Imported fill arriving.
06.01.2022 After meeting & showing a few purcahsers through this morning, temptation for a coffee from the cafe next door beckoned, providing a new perspective view for a photo.
06.01.2022 Windows insulation and sarking going into rear building. Roof on front building. View still amazing.
05.01.2022 Level 1 glazed stair screens going in
04.01.2022 Building 1 second level wall frames commenced. Building 2 third level 3 wall frames nearly complete
04.01.2022 Scaffold down on the front building
02.01.2022 60 plus m3 concrete pumped into the retaining wall footings yesterday.
01.01.2022 Roof frame on front building. View out of master bed on the top level.
01.01.2022 First ex ground pandanus in and timber retaining wall trellis started
Related searches
- Mister Cool Refrigeration & Air-Conditioning Services
Businesses Local service Business service
+61 430 988 383
87 likes
- MillerCo Technologies
Electrician Businesses Local service Home improvement
+61 402 327 846
246 likes
- Mid North Coast Kneeboarding Fraternity
Businesses Non-profit organisation
+61 439 921 294
115 likes