24.01.2022 New line marking and new RRPMs installed in place (Five Dock)
18.01.2022 Coved finish in Russell lea
18.01.2022 Services adjustments by one of our accredited staff
18.01.2022 New refuge island construction, handrails & signs installed in v-locks also other associated works (Five Dock)
17.01.2022 Planter box Retaining wall construction (Drummoyne)
16.01.2022 Formwork stripped, shared cycleway cleaned, new kikuyu turf been laid and watered (West Ryde)
16.01.2022 Glebe (streetscape works)
15.01.2022 Adjustment of new asphalt level, path and BBQ are new construction. (Cabarita Park- Specifically designed and constructed for friendly wheel chair use)
14.01.2022 Cleaned, painted walls and turfed area around the planter box (Drummoyne)
13.01.2022 The beginning of a new construction of 2.5m width shared cycleway (West Ryde)
12.01.2022 Hand excavation and reconstruction of coved finish footway (Drummoyne)
12.01.2022 Water proof paint applied, filled up organic soil & tree planted in planter box (Drummoyne)
09.01.2022 Preparation for the new soil & kikuyu turf for the shared cycleway (West Ryde)
08.01.2022 SL82 mesh on chairs and Connelly joints with dowels installed prior to the pour day (West Ryde)
08.01.2022 Glebe (road re-sheet complete)
08.01.2022 Reconstruction of footway coved finish (Concord)
05.01.2022 Asphalt patch works (Five Dock)
03.01.2022 Glebe (road re-sheeting)
02.01.2022 Emulsion applied to existing base course and job has been asphalted AC10 200m2 in 1day (Cabarita Park)
01.01.2022 The start of the planter box construction (Drummoyne)
01.01.2022 Asphalt and concrete all at once Chiswick
01.01.2022 Chiswick complete
01.01.2022 Day of pour for shared cycleway (West Ryde)