Australia Free Web Directory

Rockcrete Constructions in Patterson Lakes, Victoria | Home improvement



Click/Tap
to load big map

Rockcrete Constructions

Locality: Patterson Lakes, Victoria

Phone: +61 431 124 605



Reviews

Add review



Tags

Click/Tap
to load big map

06.05.2022 Little piece of plan grey concrete, ready for services to get installed.



26.04.2022 Made an on-site exposed display. Few hundred sqm of exposed agg on this site.

09.04.2022 Architecturally designed locker bays for him & her. I mean it’s and theirs?!

31.03.2022 Footing for brick fence.



20.03.2022 Broke a main gas pipe for a high school today got told it was disconnected. There was another one right next to it that was active. was baffled for a little while. Poor kids couldn’t do home economics today. Still got blinding poured.

28.02.2022 Ready to pour. Hope we beat tomorrow.

08.02.2022 Boundary footings with bored piers for a new brick fence.



25.01.2022 Fire pit area Will be tiled in travertine Catching up on the jobs everyone’s been waiting months for.

25.01.2022 Front yard blitz

25.01.2022 92 screws piles 4m deep, ready for some plumbing.

24.01.2022 Kensington slab all polished up & finished.

24.01.2022 Ready for some Bondek.



22.01.2022 Alpine ice black exposed.

21.01.2022 2 townhouse, 265 cubes, 2 days, 2 trucks, 2 brothers, 2 easy. #winterishere

21.01.2022 That’s it, 2020 done. Larry, Moe & Curly all washed and packed up. Have a good Christmas & New Year Everyone. Stay Safe.

20.01.2022 Big juicy extension slab coming up.

20.01.2022 House Underpinned Jacked house up 24mm, cracks in plaster closed up inside. Grouted underpins. Stage 2 next week.

18.01.2022 1900mm wide extension slab with 7 bored piers. We like the chippies on this job so we drilled their stump holes.

17.01.2022 Suspended Planter Box.

17.01.2022 Garage Slab poured. Got a bit a shine on it.

16.01.2022 Shed slab, Driveway & Path.

14.01.2022 Deck all ready to go.

14.01.2022 130mm thick slab with SL81, few bays have another layer of SL72. Ready for hydronic heating.

13.01.2022 Little extension slab and footing. Sitting on 9 bored piers. Bollocks access but we got it done.

13.01.2022 Crossover & footpath. Under screed paths for tiles. Felt good having more then 5 people on site today.

12.01.2022 Decent size shed.

11.01.2022 Alfresco Extension.

07.01.2022 New vio35 Bellissima

06.01.2022 Little site scrape, started drilling 3m deep piers. Extension slab coming up.

06.01.2022 Back filled and ready for pool dig.

06.01.2022 2 more decks poured & a few steps.

05.01.2022 Reinstate footpath & crossover.

03.01.2022 Shed slab, triple 4-L11 trench mesh & double SL81 on 450mm x 3.5m deep piers & Little paving slab for our mates at @ftgccblues

03.01.2022 First pour ready. This entire deck has 4 different levels & 3 sets of steps.

02.01.2022 Extension slab. Double mesh 1m deep beams 1m access. 20 cubes barrowed out.

21.12.2021 Not the best day to dig a pool but we got there.

12.11.2021 Old footing replaced with a new footing.

Related searches