25.01.2022 Demolition at west Croydon was underway last week through the heat, with footings underway this week. Looking forward to a fresh slab.



24.01.2022 The boys were busy today with the commencement of wall frames at Largs. The weather was on our side with a small shower at knock off to cool us down. Welcome aboard the team to our newest edition Jack Banwell. Jack has finished his apprenticeship and joined the team on what we hope to be, a long and fulfilling career at ROMERS.

22.01.2022 Just a quick before post of Largs bay before we start demolition works this week.

22.01.2022 The hebal floor at prospect was finished off today and ready for upper wall frames.



22.01.2022 Day one of demolition at Largs and the boys have made good progress.

21.01.2022 The guys from APC plumbing and gas services have finished there pipe work and we are ready for concrete. Nice work as usual boys.

20.01.2022 Peterhead demolition is complete with footings to be dug this week.



20.01.2022 Largs brickwork looks fantastic with a pressure wash. Inside if flying along with gyprock done, fantastic work from Appealling Ceilings.

20.01.2022 The boys have really embraced the nice weather of late with so much going on around the jobs, and today frameing the lower frames at prospect ready for floor trusses.

19.01.2022 Check out these led solar power sky lights recently installed by the boys at Largs. Powered buy the sun, with no need to cut penetrations into your tin or tiled roof. This is a very simple and cost effective way to throw some extra light into your home.

19.01.2022 Fullarton is looking great with floors going down, also doors and handles fitted.

19.01.2022 Today the boys started the roof construction at Largs, this place is really starting to take shape. Windows due to arrive this week, with brick work to follow shortly after.



16.01.2022 The boys were busy today at prospect, first floor wall frames are built and stood, ready for the roof frame. Brick work is going up at the same time on the ground floor. Plus the original home has been revamped with bathroom, en-suite and laundry all gyprocked and plastered ready for tiling.

16.01.2022 This week we begun the frameing process at glandore. It’s a busy little hive at ROMERS right now.

14.01.2022 The boys have been busy at prospect over the last week with completion of the lower wall frames. Floor trusses have been installed and hebal floor is well underway.

13.01.2022 At ROMERS we are working hard to keep our customers and staff safe through out the COVID pandemic. This has now become a lot easier in the office with this personalised hand sanitiser station. Big thanks goes out to Michael for this exceptional gift.

12.01.2022 Underdale has made more progress last week with the plasterboard hung and ready for flushing.

10.01.2022 Last week began the process of the wall coming down at Largs. Here’s a short timeline of bricks coming down, huge 4.6m steel T beam going in and plastered up ready for sanding and painting.

04.01.2022 The guys at JH concrete have dug the footings, and poured the piers at Largs in preparation for the slab once the under floor plumbing is in.

03.01.2022 The bathroom and en-suite renovation at Beaumont has been finished of with mirrored doors and looking absolutely amazing.

03.01.2022 Largs roof frame is looking good and not far off cutting into the original roof and completing this monster.

02.01.2022 Structural steel for the lower wall frames at prospect is in, and wall frame plates marked out ready for frameing.

02.01.2022 Yesterday the tin went on the carport at Fullarton. Plenty of cover for off street parking.

02.01.2022 The boys finished of the demolition on Friday, ready for the machines to roll in tomorrow and clean up the brick and concrete.

01.01.2022 Jones earth moving has been busy the last two days at Largs with the slab preparation. Nice work as always.

01.01.2022 First day of demolition at west Croydon and it was a warm one.