Australia Free Web Directory

Rustyz Constructions in South Morang, Victoria | Carpenter



Click/Tap
to load big map

Rustyz Constructions

Locality: South Morang, Victoria

Phone: +61 434 521 598



Address: Whittlesea 3757 South Morang, VIC, Australia

Website:

Likes: 217

Reviews

Add review



Tags

Click/Tap
to load big map

23.01.2022 Double storey fix complete ready for paint



22.01.2022 Rustyz constructions is currently seeking a 1st or 2nd year carpentry apprentice for immediate start. Must have car and license or a means of getting to and from work. Must be hard working and willing to learn. All work is based around Doreen, Mernda, Craigieburn. If this is you or know of someone that this will suit please contact me on 0434521598. Thanks

21.01.2022 Black butt deck. Awesome looking entertaining area.

21.01.2022 Split level, double storey house final finished the weather boards, eaves and blueboard walls. Been a long road on this job due to the sheer size and architecture. But it has turned out awesome and even with them painted too



18.01.2022 Black butt decking boards. This is a great way to increase the curb apply of your home and it looks great too.

17.01.2022 Fix on a 25sq double storey all completed ready for paint

17.01.2022 Beautiful merbau deck all complete. This deck has a 140mm picture frame with 90mm internal boards. Complete with built in steps and seat. Big thanks to Craig Broderick and Amy Broderick for letting Rustyz Constructions to build your dream entertaining area. This transformation is huge. Hope you enjoy it.



16.01.2022 Raised merbau decks with stairs. Also stairs in the garage ti access the house.

14.01.2022 90mm Merbau deck has absolutely transformed this alfresco.

12.01.2022 16sq single storey all clean and completed ready for roof cover.

11.01.2022 Before and After photos. This Merbau deck has really transformed this outdoor entertaing area. Thank you to Paul Andrew and Robyne or choosing Rustyz Constructions hope you enjoy it.

09.01.2022 35 sq single storey with high ceilings, raised 3m ceiling in the entry and 3m raised cathedral ceiling in the kitchen/dining room



09.01.2022 35 sq single storey on stumps.

05.01.2022 22 sq Single storey frame on a sub-floor all complete

02.01.2022 25sq double storey

02.01.2022 45sq double storey finally completed ready for roof cover.

02.01.2022 25 sp single storey with counter levered front gable and expose hardwood rafters

02.01.2022 Eaves and weatherboards install on this double storey. Now ready for paint.

01.01.2022 450 eaves done on the last frame we completed. Just waiting for plaster to be done and we can do the fixing.

Related searches