24.01.2022 Frank St - Wetherill Park Today we are proud to announce the completion of another renovation project. This project involved complete plumbing repairs and full renovation of 4 bathrooms and 1 shower room. Here are some astonishing results ... #bathroom #renovation #construction #builder #industrial #commercial #property #warehouse #office #before #after



21.01.2022 To make their unit more attractive for potential tenants, our client engaged us to remove a mezzanine floor, increasing the functional floor area of the warehouse. If you need work done at your industrial property, get in contact with us.

20.01.2022 Frank St, Wetherill Park This week our team started the #bathroom #renovation in this warehouse/office building. Works will include the following: - Removal of existing toilets, vanities and tiles... - Replacement of all #toilets - Replacement of all #bathware - #Waterproofing - #Plumbing - #Tiling - New #Shower install - New #Laundry install - #Lighting repairs - #Painting - #Cleaning See more

17.01.2022 #erskinepark #officefitout complete. Beautifully painted by the painter/artist Lewis Petros



14.01.2022 #smithfield - the structural steel for the roof has been completed and the roof sheeting has been installed after demolishing the old famed roof and walls. #sandsservices #s&sservices #makegood #structuralrepairs

13.01.2022 #erskinepark - all the trimmings have been installed around the cladding to make it look complete. It’s the small things that make the difference. #sandsservices #industrialproperty #bolloré

09.01.2022 The concrete roof of this warehouse was structurally damaged as the steel supports had rusted and given way in one section. The roof was in danger of collapsing at any moment so we brought the roof down for the client by placing 5t of weight on it. The roof came down exactly as planned. #sandsservices #structuralrepairs #industrial #industrialproperty #smithfield



08.01.2022 #smithfield Demolition of concrete panel walls with a brick skin to open up the warehouse. #sandsservices #s&sservices #makegood #industrial #industrialproperty

07.01.2022 Sleigh Pl - Wetherill Park Our team was assigned to carry out a make good in this warehouse/office which briefly involves: - Cutting and restoring damaged concrete floor in the warehouse ... - Concrete spalling repairs using high strength epoxy - Roller doors servicing - Fire equipment servicing - General office repairs - Complete commercial cleaning See more

07.01.2022 #Linemarking at #arndellpark #sandsservices #s&sservices #industrial #buidingmaintenance

07.01.2022 The tedious, high risk work of demolishing the collapsed concrete roof. #sandsservices #structuralrepairs #makegood #industrial #industrialproperty

05.01.2022 #Smithfield - concrete panel walls have been removed. We are now ready to start constructing the roof. #sandsservices #structuralrepairs #makegood



05.01.2022 Long St, Smithfield Concrete cutting and excavation works have commenced today. We are in the process of preparing to relocate the rainwater pipes under ground and repair the warehouse concrete floor. #sandsservices #construction #builders #industrial #warehouse #repairs

03.01.2022 Make-Good S&S Services was assigned to carry out the end of lease make-good in this warehouse & office which used to be a prestige car dealership. Our team managed to complete all the works required within 1 week!

03.01.2022 This wall is starting to take shape as the metal cladding sheets, FC sheets and rapid roller shutters are getting installed.

03.01.2022 Job Completed! Our team managed to finish this project in time with excellent finishing quality. Within less than 2 months, we delivered the following: - Construction of a 46m long x 10m high structural wall finished creating a new temperature-controlled warehouse space. ... - Construction of a large office. - Construction of a warehouse entrance. - Construction of 320 sqm suspended ceiling. - Painting of 1200 sqm of concrete floor with epoxy. See more

03.01.2022 Demolition of the collapsed concrete roof is complete. Extra bracing in addition to the props were installed on the surrounding walls. We are now ready for stage 2. Redesign the area without the room so that it’s one big open area in the warehouse. Then we can demolish the walls, install structural steel and install a new sheet metal roof. #sandsservices #industrialbuilding #makegood #industrial

01.01.2022 Some more images from the concrete roof we had to bring down as it was going to collapse at any moment due to rusted supports giving way. We braced the walls, brought down the roof, constructed a temporary roof and cover to protect the warehouse from the elements and commenced the demolition work. #sandsservices #structuralrepairs #industrial #industrialproperty #makegood #smithfield

01.01.2022 Wall demolition process just commenced this afternoon. The team will be working long and late hours to finish this project before the end of this week. #sandsservices #industrial #construction #maintenance