Australia Free Web Directory

Shannon Clerke Plastering, Maintenance and Renovations | Local business



Click/Tap
to load big map

Shannon Clerke Plastering, Maintenance and Renovations

Phone: +61 416 176 348



Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 Check out this awesome before and after from our team!!!!



20.01.2022 Suspended ceiling.

18.01.2022 Another wardrobe built by our team.

17.01.2022 From small closed in living spaces to one big open plan living area.



17.01.2022 Some stack stone tiling for a pond in the brother in-laws man cave

16.01.2022 Finished product for a whole house renovation. Thanks to everyone who was involved in this project. Was at times challenging, but looking forward to the next one. Painting - SCM Painting Aircon install and service - Smart Chill Air Conditioning & Refrigeration Carpet - Anderson’s Gatton... Shower Screen & Mirror - Springwood Glass Plumbing & electrical work all carried out by licensed trades SHANNON CLERKE PLASTERING MAINTENANCE & RENOVATIONS: Wardrobe builds, removal of pre existing wall in living area, all tiling work (minus toilet, bathroom floor & laundry), kitchen bench top install, range hood install, kitchen sink install, bathroom vanity install, plastering work, all doors throughout the house replaced, blinds install. See more

16.01.2022 Another project with daddies little apprentice.



13.01.2022 Suspended ceilings and insulation

13.01.2022 Tiling in a shower

10.01.2022 Extension of a walk in pantry

09.01.2022 Built 4 wardrobes as part of a massive renovation we are working on at the moment.

08.01.2022 Little apprentice



07.01.2022 Client wanted to rip a cabinet out to make room for a taller fridge.

06.01.2022 Walk through of a whole house renovation

03.01.2022 Working with the wife is always so much fun, never a dull moment lol. More tiling today.

02.01.2022 A big happy 40th to my hubby!!! He is having a well earned day off today.

02.01.2022 Before and After’s of wardrobe builds

01.01.2022 No rest for the wicked. 4 days off means another project for the wife... building a room in the shed for her gym and a man cave.

Related searches