Steelcad Drafting in Newstead, Queensland | Business service
Steelcad Drafting
Locality: Newstead, Queensland
Phone: +61 7 3257 3910
Address: Unit 20, 76 Doggett Street, Newstead 4006 Newstead, QLD, Australia
Website: http://www.steelcad.com.au
Likes: 553
Reviews
to load big map
25.01.2022 Queensland Steel Excellence Awards Chairman of the Australian Institute of Steel Detailers, Clayton Roxborough introduces the inaugural Award for "Integrated Project Delivery" (IPD) The winning nomination was judged to be the Meadowbrook Shopping Centre Project. IPD team was McVeigh Consulting, Steelcad Drafting & ADCO Constructions.
25.01.2022 The Courier Mail covered the opening of the Robina Town Centre Development which Steelcad played a pivotal part in delivering. The expansive precinct is spread over 2 levels and features fresh food retails, cafes, bars and restaurants. The Kitchens... not only supports and showcases local producers, suppliers, chefs and restaurateurs, but also provides customers with an educational, inspiring and activated space where they can socialise, experience, eat, drink, shop and immerse in incredible food, curator Daniel West said. The lavish $160million development is billed as the first of its kind in the country. Steelcad recently received an award for their role in this project.
24.01.2022 Steelcad and Sedgman win the industry award for Integrated Project Deliver (IPD) for the Byerwen Coal Handling Plant. The award was accepted on behalf of the Steelcad team by Sean Roach. A special mention also goes to Amanda Rachow her efforts on this project and to Simon Albrecht from Sedgman.
24.01.2022 Queensland Steel Design Awards night. Steelcad were recognised for their involvement in the winning entry in the small buildings category. The new fabrication facility for Brezac Constructions. A special mention to Adam Kucharski & Graeme Enever for their skills, diligence & communication on this project.
24.01.2022 Queensland Steel Design Awards held at the Convention Centre earlier this month. Were very proud to say that Steelcad were short-listed in 3 categories and took out the top award in two of them. Well done to Team Leader, Graeme Enever & his excellent crew at Steelcad Drafting.
23.01.2022 http://www.youtube.com/watch?v=NG5G85-psds
23.01.2022 http://www.youtube.com/watch?v=NritoIp49WA
23.01.2022 Merry Christmas from all of us at Steelcad!
23.01.2022 http://www.youtube.com/watch?v=WxcSHL9XPDE
22.01.2022 https://www.facebook.com/QantasFoundersMuseum/videos/415547326026318/
22.01.2022 July - Steelcad staff visit the WDT fabrication yard in Brisbane to go over some of the steelwork on the Caval Ridge Coal Project. L to R Adam, Sean, Amanda & Graeme
22.01.2022 Another update from the Steelcad team on this project.
21.01.2022 Duration: 4.5 months. 11 conveyors in total.
21.01.2022 Tonnage - 140t Cold Rolled Material - 9700 l/m Year - 2014
20.01.2022 Steelcad Drafting started work on this project back in May 2019. The roof structure is mostly CHS pipe truss, with Universal Beams supporting the under-slung Aramax roof. Its a complicated structure, with twelve columns in total, which are not vertical and two of the end bays are set to an angle. There are so many compound angles on this project. It has been equally challenging to draw as it has been to fabricate.... The Aramax roof has not yet been installed and this will be another challenge for the installers on site. It is to be connected to the underside of the structure and all of this work is being conducted with the 747 and 707 in situ. Steelcad also setout the temporary propping for the columns and trusses, making sure to miss the Aircraft. Technology used on this project; IFC models from the consultants to assist with geometry Point cloud survey of the site to assist in working with and around the Aircraft on site Tekla Structures for Shop detailing Navisworks for model collaboration https://www.facebook.com/QantasFoundersMuseum/videos/1370753853092107/UzpfSTY4MjA5OTY4NjoxMDE1NzUyODU5NDY3NDY4Nw/?notif_id=1572298306985316¬if_t=feedback_reaction_generic
17.01.2022 Queenslands Tower of Power, No.1 William Street Brisbane.
15.01.2022 ASI Steel Excellence Awards. A great night out for our staff & their partners.
13.01.2022 Sydney Yard Access Bridge 2017 Steelcad’s Scope: Span 1 82.7t Span 2 126.8t... Span 3 58t Cladding Panels - 40.6t A complex road access bridge in the heart of Sydney CBD, to access the rail yard. The bridge is curved in plan as well as elevation and to top it off the bridge girders are also cambered. The girder spans 1 and 2 (the box girders) are 1000 wide and 2200 deep, they were fabricated in sub assembly sections and welded together to form the super assembly. Numerous check dimensions were provided to help the fabricator keep the bridge geometry true and correct. Many challenges were overcome by working closely with the Engineer, builder and fabricator. 3D model images:
13.01.2022 We had a visit from Paul & Oskar from Building Point to demonstrate the latest HoloLens technology. The HoloLens is basically a pair of mixed reality smart glasses (Augmented Reality) developed and manufactured by Microsoft. You can see your surroundings, just like normal glasses, but they also project an image to the inside of the lens from an in-built processor running windows 10 software. You use your hands and fingers like a mouse to operate menu functions that are picked... up by small cameras mounted in the glasses. In-built scanners complete the virtual reality experience by allowing the wearer to "walk around" the 3D model of the structure. What a unique experience it is too. We were looking at the Robina shopping centre model we created for ADCO.
12.01.2022 To all modellers & detailers, we thoroughly recommend getting along to the convention and taking part in the National forum event.
12.01.2022 Tonnage - 760t Duration - 2011 to 2012.
10.01.2022 Type of work - Structural and Mechanical Tonnage - 1560 Tonne Project Duration - 8 Months
10.01.2022 Sydney Yard Access Bridge 2017 Steelcads Scope: Span 1 82.7t Span 2 126.8t... Span 3 58t Cladding Panels - 40.6t A complex road access bridge in the heart of Sydney CBD, to access the rail yard. The bridge is curved in plan as well as elevation and to top it off the bridge girders are also cambered. The girder spans 1 and 2 (the box girders) are 1000 wide and 2200 deep, they were fabricated in sub assembly sections and welded together to form the super assembly. Numerous check dimensions were provided to help the fabricator keep the bridge geometry true and correct. Many challenges were overcome by working closely with the Engineer, builder and fabricator. 3D model images:
09.01.2022 http://www.youtube.com/watch?v=2qQBdSX2uw8
07.01.2022 Provisional agenda highlights some of the topics up for discussion. If you have any thing youd like to add, please contact the AISD with your ideas.
06.01.2022 Queensland Steel Design Awards held at the Convention Centre earlier this month. We're very proud to say that Steelcad were short-listed in 3 categories and took out the top award in two of them. Well done to Team Leader, Graeme Enever & his excellent crew at Steelcad Drafting.
05.01.2022 Queensland Steel Awards Congratulations to the team on the Robina Town Shopping Centre expansion project for their award winning performance. The award was accepted on behalf of Steelcad by Amanda Rachow. A special mention also to Phil Shanks for managing this challenging project.
05.01.2022 In early October, a team of modellers from Steelcad were fortunate enough to visit the workshop of one of our local fabricator clients and have a close up look at some of the steel plate work they were currently detailing. It was still early days in the fabrication program so there werent a lot of the larger hoppers being made at this stage, however our detailers were able to have a good look at some of the medium size hoppers and pipework branches as well as seeing the rubber lining being applied.
05.01.2022 Queenslands Tower of Power, No.1 William Street Brisbane. Last week, some of our team had a walk-through of the Crown & Spire (levels 39 to 46).
05.01.2022 http://www.youtube.com/watch?v=gAyvxvyX5RQ
04.01.2022 https://www.facebook.com/QantasFoundersMuseum/videos/796922167419569/
03.01.2022 1st Secondary Roof Louvre Cassette Frame installation 13/05/16 Approximately 100 tonne in Cassette Frames.
03.01.2022 Provisional agenda highlights some of the topics up for discussion. If you have any thing you'd like to add, please contact the AISD with your ideas.
02.01.2022 Queenslands Tower of Power, No.1 William Street Brisbane. The view from the upper floors
Related searches
- That's The Shot Photography
+61 411 049 185
North Road 3165 Bentleigh East, VIC, Australia
1870 likes
- Super Woman Co.
Business service Product/service Personal coach
Super/Woman HQ St Kilda, VIC, Australia
353 likes
- Buzzlink Digital Business Reputation Management City Of Glen Eira
Business service Web designer Marketing agency
+61 1300 961 691
Service Area: Carnegie, VIC, Australia
3 likes