Australia Free Web Directory

Steelweld Steel Fabrication Perth | Local business



Click/Tap
to load big map

Steelweld Steel Fabrication Perth

Phone: +61 427 666 250



Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 Tanks for a service module ready for blast and paint



25.01.2022 Handrail Fabrication

24.01.2022 New car wash building almost complete. This project had 23tonne of steel and because of the design Steelweld also under took the installation of the concrete panels so as we had full control of the site.

24.01.2022 Awning installed for the new Click and collect at Woolworths



23.01.2022 New storage cage complete with bump rails for Woolworths all finished in HDG

22.01.2022 Site team working through the weekend to finish up a project

21.01.2022 Some light weight trusses ready for welding



20.01.2022 Been a while from we posted as its hard to get photos of all the projects. Here is an awning completed this week for West Perth Football club

20.01.2022 Welders wanted for night shift In Perth based structural workshop. Please email [email protected]

20.01.2022 Viewing tower installed this week at Larkhill Racecourse.

19.01.2022 Stair case and bollards fabricated and installed for one of our valued clients.. Stair and handrail is all HDG with the bollards been powder coated yellow.

18.01.2022 One of of trusted suppliers dropping of the remaining 10 tonne of a large package started this week



18.01.2022 Gas bottle cages fabricated and installed

18.01.2022 Handrail installed at Stirling Gate Woolworths

18.01.2022 Something a little different this week. Customer asked us to make a concrete pipe lifter and the boys did a great job.

17.01.2022 Mezzanine floor installed at the car wash project

17.01.2022 Covered area for School 3 hours East of Perth

17.01.2022 Byford School project. Steelweld had the contract for three of the new buildings with a total of 45tonne. All steel was supplied HDG with a large part of each building having the steel work exposed

16.01.2022 Steel loaded and on its way to galvanise. This is part of a 15tonne package we have just completed and now the client has requested a further 15tonne for fabrication.

16.01.2022 With the company Director been a West Coast Eagles fan it was a great privilege to be awarded the contract for the new gate house and ablution block at Lathlain Park. More photos to follow upon completion.

16.01.2022 Boilermaker’s required for both workshop and site work. Must have experience with structural steel. Contact Gary on 0427666250

12.01.2022 Clifton Hill Primary School - Building rebuild This project was demolished, fabricated and installed in under 3 weeks to fit in with the clients urgency to get the building back in commission for the children

11.01.2022 Rigging crew dropping a one tonne beam into place on the first floor of a refurb project

09.01.2022 Extension to a primary school that was erected just before the Christmas break

09.01.2022 We are seeking expression of interest for a Structural steel Draftsman. Local experience and familiar with West Australia codes. If interested please contact Gary on 0427666250

09.01.2022 Cranked beams fabricated and installed for an extension to a local cricket pitch

09.01.2022 Few photos of some handrails installed today.

08.01.2022 One of our recent projects featured in this months Builders Choice Magazine. We supplied the complete Structural Steel package for this new McDonalds store in the Perth hills

07.01.2022 Really nice rear printed 10mm acrylic panel on 25mm stand offs for the office/reception at Steelwelds new premises in Malaga

06.01.2022 Portal frame installed over the Astor Arcade. Due to the location a 80 tonne crane was required to lift the portals into place

05.01.2022 Primary School extension complete. Just over 11 tonne of fabricated steel and purlins all finished in HDG

04.01.2022 Steelweld have the following positions available due to some large projects starting. Boilermaker’s - Day and afternoon shift TA’s 2nd class welders- afternoon ...shift Truck driver with hiab ticket Boilermaker riggers for site Workshop Supervisor For further information please contact Gary on 0427666250 or email [email protected]

04.01.2022 Awning and bollards fabricated and installed. All steel supplied HDG

04.01.2022 Double staircase supplied and installed complete with handrail all HDG

03.01.2022 Loading dock for a Woolworths store all engineered and fabricated from aluminium.

03.01.2022 New work shop for the shire all finished. Really nice project that turned out great

02.01.2022 Been a while from we posted as it’s hard to get photos of all the projects. Here is an awning completed this week for West Perth Football club

02.01.2022 Balustrade, handrail and a mechanical compound for a school project that we are working on

01.01.2022 Small package of columns ready for dispatch to the paint shop before been installed at the new Northam aquatic centre.

Related searches