Australia Free Web Directory

Strafford Building Group in Melbourne, Victoria, Australia | Event planner



Click/Tap
to load big map

Strafford Building Group

Locality: Melbourne, Victoria, Australia

Phone: +61 424 905 102



Address: 949 Centre Rd Bentleigh East 3165 Melbourne, VIC, Australia

Website: http://www.straffordbuildinggroup.com

Likes: 159

Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 Bentleigh East Project site setup done and now ready for construction



25.01.2022 Underground services going in at our Cranbourne development

25.01.2022 Glen Waverley job demolition nearly completed - ready to start soon

25.01.2022 Calling all tradies, builders and DIY weekend warriors! Want to know how to save time and money on your next deck build? Introducing Decktec a revolutionar...y new Australian made decking system that reduces labour by more than 50% while giving you the ability to lay your deck with perfect alignment every time. Click "Learn More" to ask questions and find out more about Decktec



24.01.2022 McKinnon frame all completed now and ready to start locking up

24.01.2022 Sandringham project 4 weeks to go lets do this

23.01.2022 We created this stunning kitchen at our Hampton East Project



22.01.2022 Frame stage completed at our 3 unit development in Hampton East

21.01.2022 Bentleigh East Project 2 townhouse development, built in 8 months!! - Master bedroom with en-suite and a spacious WIR with custom fit out. - 3 large bedrooms with built in robes and 2400 mirror sliding doors. - Vic Ash designer staircase with frameless glass balustrades.... - Each bathroom/power room with full height tiling, 40mm Caesar stone benches and mirror shaving cupboards. - Great living areas with French Oak Engineered 14mm floorboards. - Quality 2 pac kitchen cabinets with gloss doors and 60mm Caesar stone Calacatta bench tops. - 900mm Miele stainless steel appliances. - Ground floor ceiling height 3m and first floor ceiling height 2.7m. - Daikin ducted reverse cycle heating and cooling. - Intercom, alarm and CCTV systems through out. - Private yard with custom landscaping to the clients request. - Exposed aggregate driveways and paths. - 3000 litre rainwater tank connected to sanitary flushing systematic . See more

19.01.2022 Mckinnon job getting close to handover

18.01.2022 The only way is up

18.01.2022 Our Bentleigh project wrapping up in a few weeks



18.01.2022 Underground drainage work taking place at our Hampton East project

17.01.2022 Mckinnon project bathrooms getting ready for fit off

17.01.2022 Behind the scenes (photo shoot) #mckinnon

16.01.2022 Sandringham project all locked up now and ready for plaster!!!

16.01.2022 Hampton East project couple days out from Lock up stage

15.01.2022 Lest we forget

15.01.2022 Hey everyone out there who loves building, check out our new website!!www.straffordbuildinggroup.com

14.01.2022 2 years in planning any finally our family development is underway @ableprojex @strafford_building_group @gemmastrafford @ancella123

14.01.2022 Hampton East project progressing nicely

13.01.2022 Our Brighton Renovation is well underway now!!

13.01.2022 Sandringham 3 townhouse development!! - 3 Bedroom 2 bathroom Lux double story townhouses with 2 living areas. - Ground floor ceiling height 3m and first floor ceiling height 2.7m. - Full height doors and mirror robes with custom WIR fit outs.... - RHF kitchen stone Benchtops with contemporary shaker 2 pac cabinetry. - Polytec (natural Oak) vanity cupboards drawers to each wet area. - ILVI European selected 900cm appliances. - Abey tapware and undercount sinks. - Vic Ash hardwood stair cases. - 220mmx2200 selected French Oak Engineered flooring. - Wool Loop Pile carpets to bedrooms and retreat. - Clipsal lighting fit out with LED strip lighting features to kitchen. - Rylock Commercial double glazed windows. - Daikin 13kw Zoned ducted reverse cycle heating and cooling. - Aphone intercom and also Bosch fitted alarm systems - Private yards with Merbau deckings and low maintenance landscaping. - Eco garage automatic doors ( timber look) - Exposed aggregate driveways. - 3000 litre rainwater tank connected to sanitary flushing system. See more

11.01.2022 Drains completed at out Glen Waverley job

10.01.2022 This en-suite has all the storage you could ever wish for!!

09.01.2022 Final stages at our Mckinnon project

08.01.2022 Check out this stunning bathroom vanity palette at our recently finished renovation in Brighton

07.01.2022 Feeling those bathrooms vibes

06.01.2022 ** CAR TURNTABLE **

05.01.2022 This kitchen will put a smile on your dial

04.01.2022 Frame completed at our 2 unit site in Glen Waverley

02.01.2022 Concrete slab poor day at Glen Waverley last week!

02.01.2022 Floating vanity cupboard in the powder room mixed in with black taps, natural oak laminate and white feature tiles

02.01.2022 Unit 2 at our Sandringham project sold in September and settled today

02.01.2022 Welcome to Strafford Building Group!

01.01.2022 Hampton East Project!!

Related searches