Australia Free Web Directory

VR Konstrukt | Media



Click/Tap
to load big map

VR Konstrukt

Phone: +61 420 505 343



Reviews

Add review



Tags

Click/Tap
to load big map

21.01.2022 Ideally, we should maintain the integrity of the "single source" concept of BIM. However, when working on large complicated projects opening the FBX file of the BIM model in another application is oftentimes problematic. (4d Simulation Course out soon. . . .)



09.01.2022 If building information modeling (BIM) answers the question "what?," then construction methodology answers the question "how?" How can we show an activity that follows the schedule, specifications, regulatory requirements, management of constraints, risk mitigation - and at the same time follows identified opportunities that would help reduce time and cost? Watch this page for the most comprehensive course in 4d simulation in construction.

08.01.2022 Akashi Kaiky Bridge is the suspension bridge with the longest span in the world since 1998. Its main span has 1,991 meters in length and it connects Kobe and Awaji Island in Japan.

04.01.2022 Can the design of the elevator still be improved in light of Covid?



02.01.2022 Multimedia is the best approach to 4d Simulation in construction. You can use dedicated software to produce the 4d deliverable, for example; 3ds Max or Cinema 4d to model and animate the scene, use FL Studio to edit and sync the background music and voiceover, use Premiere Pro or After Effects to composite. . . . . there is no project visualisation that you can't produce using these tools, no matter how complex the design or construction activities. First, you have to learn the basics. https://youtu.be/bCmbAEAuQGM

Related searches