T 4 Tiling | Local service
T 4 Tiling
Phone: +61 410 588 115
Reviews
to load big map
23.01.2022 We are very proud to have been apart of this amazing community fundraiser for the Albury Wodonga Cancer centre. The trust has raised a massive $65,000 for the centre.
23.01.2022 A nice house T4tiling completed locally, it has a huge fish pond at the entrance and pool out the back. It was one of the first jobs locally to use 600x600 and 600x1200 rectified tiles.
22.01.2022 Barra lodge done
22.01.2022 Arnhem land coburg peninsula, another remote job for Outback Spirit Tours. We are renovating Seven Spirit Bay resort. What a beautiful part of australia. The new Villas will be absolute luxury.
20.01.2022 Trotmans tower in wodonga, it was a 2000 square meter contract, lots and lots of tiles.
19.01.2022 A splashback made with mirror tiles, stunning. Epoxy glue had to be used as the adhesive, as other glues would have destroyed the mirror backing on the tile.
18.01.2022 T 4 tiling is of to Arnhem Land again, this is the last stint for this year, it's been a great experience
17.01.2022 It's nearing that time of year again. Yes the festive period where we all have friends family etc around and eat and drink too much. If you are planning any tiling that is required to be completed before Christmas please get in touch with us sooner rather than later as we are fairly well booked out.
17.01.2022 On my way home from barra lodge Arnhem Land for a weeks break
17.01.2022 T4Tiling has finished at Morwongai station and is back at Seven Spirit Bay Resort for a couple of days to finish of there, its been a long but good 5 months working in Arnhem Land For Outback Spirit Tours
16.01.2022 Volkeswagon wodonga, this was the first VW showroom in australia to be built and of course tiled to the new design, T4tiling did a lot of liaising directly with architects in germany. T4tiling also then tiled VW in wagga. It was a challenging job in material selection, setout and cutting.
15.01.2022 T4Tiling at the Audi wagga opening. That was a 400sqm contract.
15.01.2022 Its all part of work up here in Arnhem Land
14.01.2022 Wodonga community college for Connelly construction who have been a customer of T4tiling for 16 years
14.01.2022 Woolworths in Warnambool another Connolly construction job. Dad helped me on that one. It involved about 1000 square meters. Floors were grouted with chemical wash epoxy grout and walls were grouted with water wash epoxy grout. Terrazzo tiles in the foyer.
13.01.2022 T4tiling moving from one side of resort to the other, cool work truck.
12.01.2022 A very fancy pool, with 2 wet edges and 4 underwater windows, the blend down of the mosaic was slow work, but it gives a great effect.
11.01.2022 Beautiful timber look tiles from beaumont tiles.
11.01.2022 Our latest project just about ready for hand over.
11.01.2022 T4tiling moving from Barra Lodge Arnhem Land to Seven Spirit Bay Arnhem Land
10.01.2022 Its nearing that time of year again. Yes the festive period where we all have friends family etc around and eat and drink too much. If you are planning any tiling that is required to be completed before Christmas please get in touch with us sooner rather than later as we are fairly well booked out.
09.01.2022 Nice bathroom reno
07.01.2022 T4tiling leveling a 600 sqm floor, it took 7 cubicmeters of ardit, it kept us busy for a few days, the whole floor ended up level to with 2 mm over 600 sqm.
05.01.2022 Beautiful sandstone
05.01.2022 T4Tiling in the kimberly 2011. I spent 3 months in the kimberly building a safari camp for Outback Spirit Tours. The camp is called Ngauwudu safari camp in the kimberly near mitchell falls. Tiling was only a small part, my main job was steelwork, carpentry and concrete, tiling only took 2 weeks. It was an awesome experience, but extremly hard work. Outback Spirit has been a loyal customer of T4Tiling for 7 years now.
04.01.2022 Another beautiful house, there were a lot of curves in it, the job turned out stunning.
03.01.2022 T4tiling moving from seven spirit bay job to barra lodge job in Arnhem Land, nice work ute.
03.01.2022 T4tiling loves working with natural stone
02.01.2022 T 4 tiling is of to Arnhem Land again, this is the last stint for this year, its been a great experience
02.01.2022 Shop fronts T4tiling completed in wodonga
02.01.2022 T4tiling is done at Barra lodge,of to seven spirit bay resort tomorrow to finish of there over the next couple of weeks.
Related searches
- Casada Constructions
Businesses Local service Home improvement Carpenter Block of flats
+61 417 615 241
2160 likes
- Encore Entertainment
Businesses Local service Event planner Social service DJ
+61 400 101 932
518 likes
- Karaoke with Carlos and Linda
Businesses Local service Event Party & entertainment service DJ Karaoke
+61 428 644 491
137 likes
- Katy Durn Photographics
Businesses Local service Photographer Photography and videography
+61 475 795 001
154 likes