Australia Free Web Directory

Tborg Constructions in Werribee, Victoria | Home improvement



Click/Tap
to load big map

Tborg Constructions

Locality: Werribee, Victoria

Phone: +61 412 626 746



Reviews

Add review



Tags

Click/Tap
to load big map

24.01.2022 Large 45sqm pergola built in Werribee. Massive 3.9m ridge height making it feel huge from underneath! #carpenter #pergola



23.01.2022 Frame complete and ready for inspection #carpentry #pergola #tborgcarpentry

21.01.2022 Frame work 85% complete today in just under 10 hours! Afew more hours tomorrow then it’s ready for roofing. Nice one to get wrapped up for our clients to enjoy over Christmas. #carpentry #tborgcarpentry

19.01.2022 Merbau deck completed today just in time for stage 4 lockdown! #carpentry #deck See you in 6 weeks



17.01.2022 Removal and re lay of 90mm merbau decking. Adding full length steps for a more grand feel even for a small area. #carpentry #decking #merbau

16.01.2022 Ceiling battens installed in 4 bays of this garage converted into a party room

14.01.2022 Before and after.. Marbau battened wall with a recessed tv. Great way to hide ugly pipe work in an entertainment area. #carpentry #merbau #battens



14.01.2022 Shiplap eve, battened and installed right over the standard cement sheet eves #carpentry #timber

12.01.2022 Problem 1 - Decided not to do a waterfall edge with the stone to save money. Solution 1 - Install wine racks to give the edge a finished detail. Problem 2 - Could see the joins of two seperate cabinetry pieces coming together. Solution 2 - Do feature timber slats down both sides. Problem 3 - Powerpoint on one side of the island. Solution 3 - Removable pieces to access the PowerPoint when needed. ... Moral of this post is, with every problem there is a solution! Just needed to figure them out!

12.01.2022 Hardwood door and jam, supplied and installed. New architraves and weatherboards to one side.

11.01.2022 Carport converted into a lockable garage. Roof structure and roofing was salvaged, no demolition was done. Lifted the whole area off supports and re built walls around the perimeter to support and frame for colourbond sheeting to be installed.

11.01.2022 Completed alfresco area, massive 7m high ridge and 400mm beam spanning 5.5 metres! 2 Velux skylights also installed adding even more natural light through the middle.



10.01.2022 New entry door/handle installed with architraves

10.01.2022 Swipe right for the before and afters of a kitchen/dining area remodel! Both before and after photo are taken from the same angle! Hard to believe the kitchen was on the other side of the house, at one point both kitchens were operational. Not 1 day was missed without a kitchen. Huge amount of work was put in, removal of both the window and sliding door with a larger sliding door added with sheer blinds over the top.

09.01.2022 It was time to put a brand to the name, now trading as tborg constructions

09.01.2022 Cement sheet privacy wall. Nice, cheap and effective way of blocking out any eye sores.

09.01.2022 Before and afters. Merbau seating with axon 9mm cement sheeting. New plant to come

09.01.2022 Ply installed to bring up floor levels to prepare for floating floors to be installed! Plastic and 5mm gaps to help with any moisture that could come up through the sub floor #carpentry #tborgcarpentry #flooringxtra

08.01.2022 Removal of old windows and installation of these unique style awning windows. Also architraves. Looks awesome!

07.01.2022 Deck upgrade and pergola at our Tarneit project. More progress photos to come.

02.01.2022 Pergola constructed in hoppers crossing, 7m lvls at the longest point! #carpentry #pergola

02.01.2022 Last job of 2020! French doors removed and a large pivot door installed. Stain and handle to come in the new year! #carpentry #pivot

01.01.2022 Completed today, two duel level seats out at bacchus marsh collage. #compositedecking #carpentry #seating #crosscreations

Related searches