Thermal Insulation Contracting | Contractor
Thermal Insulation Contracting
Phone: +61 3 6248 5685
Reviews
to load big map
25.01.2022 Another canopy install to a new restaurant opening soon in Newtown.
25.01.2022 About to tackle 4 x bitumen Day tanks on site at Puma Energy’s new Kwinana plant.
25.01.2022 Back in Kwinana, WA to insulate and clad Puma Energy’s bitumen day tanks.
24.01.2022 Insulating and cladding a heat exchanger within a Hobart facility.
24.01.2022 Just getting our teeth into a 1.4 kilometre Bitumen transfer line.
23.01.2022 We recently completed this 26M high reboiler and several hundred metres of associated, large bore steam piping at Norske Skogs Boyer Mill. Insulated with Rockwool blanket and clad in custom orb colorbond.
23.01.2022 About to tackle 4 x bitumen Day tanks on site at Puma Energys new Kwinana plant.
22.01.2022 Four small storage tanks for TCM Pty Ltd.
22.01.2022 Installing thermal and structural fire protection insulations to one of INCAT Tasmanias latest fast ferry projects. This one is Hull 094. Its pretty hard not to be impressed by watching these awesome vessels take shape.
21.01.2022 Just for something different. Heres a custom downlight for our mates at the New Sydney Hotel
21.01.2022 Just wrapped up 5 small cider fermenters for Willie Smiths Organic Cider. Insulation supplied by Polarclad Global Cooling in South Australia.
19.01.2022 Another two Canopys ready to install for some new restaurants in the Hobart area.
19.01.2022 Not certain how this became part of our contract, but it did. High pressure cleaning of the painted steel pipe to rid it of sea salt residue prior to heat tracing, insulation & cladding.
19.01.2022 Generator Exhaust - Parliament Square facility.
17.01.2022 This is what $45 thousand dollars worth of ruined aluminium sheeting looks like
15.01.2022 Heated Bitumen transfer line - Kwinana, Western Australia
15.01.2022 Alloy cladding for the Parliament Square project - Hobart.
15.01.2022 Back in Kwinana, WA to insulate and clad Puma Energys bitumen day tanks.
14.01.2022 A small chiller hook up at the Hobart LINC Library.
13.01.2022 A series of before & after pics of the roof plant of Calvary Hospital upgrade. Plumbing by Degree C, insulation and cladding by TIC
13.01.2022 Heres a alloy custom signage rack for Hydro Tasmania.
13.01.2022 5 tons of alloy cladding manufactured in Cambridge,TAS and destined for W.A. This is for a 1.5 kilometre Bitumen Import line were commencing shortly in Kwinana, WA.
11.01.2022 Something a little different. 2 x 22M long 250NB bitumen transfer pipe sections, pre - heat traced, insulated, alloy clad, polyurea membrane sprayed and then slid underground into concrete culverts beneath the road. These are early parts of PUMA Energies Kwinana facility.
11.01.2022 A little accumulator tank we insulated and clad for BOC gases - Hobart.
10.01.2022 Next project in the pipeline. 4 x bitumen Day tanks 18M high x 4.5M diameter. Theyll be getting 100mm of insulation and then clad in V-Rib aluminium cladding. Two currently standing plus a further few laying down in the manufacturers yard ready for transport to site.
09.01.2022 Thermal insulation fitted to crew accommodation for one INCAT Tasmanias current projects, ship 089
09.01.2022 Two twin bay Canopys for the Royal golf course in seven mile beach. A big improvement on their old kitchen and canopy.
09.01.2022 4 x new fly ash hoppers. Insulated with 100mm Rock wool and clad over in colorbond. Hoppers fabricated and installed by Haywards PL
08.01.2022 New sheets have arrived, but we’re about to get flogged by a massive storm
06.01.2022 New sheets have arrived, but were about to get flogged by a massive storm
05.01.2022 A pair of 20KL tanks for Juicy Isle - Cambridge.
05.01.2022 The beginnings of another canopy for the The Winston
05.01.2022 Small job within a poo plant for Taswater, Hobart. Didnt actually ask what this hot thing was, lets call it a heat exchanger. Insulated in 450 rock wool and clad in 0.8 aluminium.
04.01.2022 Put the finishing touches on these four bitumen day tanks today and officially completed the task. This plus the 1.4 kilometre bitumen transfer line has gone off like clockwork. Pretty proud of the the way the boys have worked to pull this one together, on time and under budget!
04.01.2022 Got a start on the alloy cladding for PUMA Energies heated bitumen line late last week. All pre-fabricated in our Cambridge workshop and sent to site. Its always a good feeling when it fits
03.01.2022 Possibly the most difficult duct and canopy installation weve ever taken on. Located within a tenancy of the 126 year old (former) Imperial Hotel, Collins Street, Hobart. Two canopies with 3 floors of external ducting driven by 2 fans. This one didnt go entirely to plan, but its now complete and functioning well.
02.01.2022 Thermal insulation fitted to the Superstructure of INCAT Tasmanias Hull 089
02.01.2022 PIR & PVC jacketing to a small stainless heat exchanger on site at CUBs Cascade Brewery.
Related searches
- Jackson’s Auto detailing
Businesses Vehicle, aircraft and boat Automotive aircraft & boat
+61 474 311 159
577 likes
- TravelManagers-Lynne Papenfus
Businesses Travel and transport Travel services Travel service
+61 402 861 307
60 likes
- Rebecca Fantasia
Businesses Beauty, cosmetic & personal care Hair salon Makeup artist Make-up artist
+61 412 946 339
146 likes
- House and Home Management
Businesses Holiday home rental Property management company Hotel and B&B
+61 431 206 855
204 likes