Australia Free Web Directory

Thornton Engineering Geelong in Corio, Victoria | Engineering service



Click/Tap
to load big map

Thornton Engineering Geelong

Locality: Corio, Victoria

Phone: +61 3 5274 3180



Address: 370 Bacchus Marsh rd. 3214 Corio, VIC, Australia

Website: http://www.thorntoneng.com.au

Likes: 225

Reviews

Add review



Tags

Click/Tap
to load big map

24.01.2022 50T+ rectangular hyperbaric chamber getting a lift down the workshop ready for PWHT before hydro and paint. #welding #pressure #engineering #thornton



22.01.2022 Laying some Nickle overlay on a tubesheet forging via Electroslag welding to go on a high pressure heater for QAL.

22.01.2022 300 degree post heat bake out on some 9chrome nozzle welds in a heat exchanger return head. #9chrome #engineering #fabrication #thornton

22.01.2022 Module frame for gas plant in the middle of a three coat paint system #thornton #engineering #module #frame #gasplant



21.01.2022 A 63 tonne beam for the Rosanna rail bridge crossing over Lower Plenty rd. Always great to be involved in local infrastructure. #infrastructure #bridge #thornton #engineering

21.01.2022 First welded Titanium tube bundle for viva energy geelong

20.01.2022 Finishing touches to this 100T+ 35m long 3m diameter vessel for an Australian refinery. #Thornton#engineering#pressure#vessel



20.01.2022 Completed triple-lock hyperbaric chamber for Fink engineering to be installed at the Hobart hospital upgrade this year.

19.01.2022 Check out the bridge we fabricted lifted in and fit like a glove.

17.01.2022 A recently fabricated high vacuum column. 7m diameter and 5m tall with full 317 stainless internal cladding. #vessel #pressure #stainless #cladding #thornton #engineering

13.01.2022 Heavy plate rolling and Sub arc welding positions available

12.01.2022 A Pedestrian bridge we completed for a client after the original fabricator went out of business.



09.01.2022 This 45m long X 4.5m diameter column weighing in @ 100T is ready to make the journey from Geelong to a refinery in Brisbane via road and ship. #thornton#engineering#pressure#vessel#geelong

08.01.2022 Finishing off a pair of rail bridge beams for Rosanna station upgrade to be installed over Easter.

06.01.2022 Sign gantry ready to go for Tullamarine widening project.

06.01.2022 Pair of loop coolers for Incitec Pivot Limited

06.01.2022 On its way to hydrostatic test #thornton #engineering #vessel #pressure

05.01.2022 Job done on a stainless steel jacketed heat exchanger shell #thornton #pressurevessel #engineering #australianmade

04.01.2022 New exchanger FSBW to the existing furnace for a local refinery. #thornton#engineering#pressure#vessel

04.01.2022 A project going in our 7x7x25m long PWHT furnace with a run time of 8hrs and a hold temperature at 625C for 1hr. #furnace #heattreat #pwht #pressurevessel #heatexchanger #thornton #engineering

03.01.2022 68m pedestrian bridge getting close to completion. #welding #bridge #engineering #thornton

03.01.2022 Room to lift a 4m diameter barrel section over a 5m high bridge section with room for more. #engineering #steelfabrication #thorntoneng #australianmade

03.01.2022 We’ve installed the trusses for the pedestrian overpass connecting Rosala Avenue in Altona North to Richards Court in Brooklyn. Take a look at how our crews p...ut the new bridge together. We thank locals for their patience while we build the new overpass. It took around four hours and 20 workers, all observing strict COVID19 work practices, to complete the lift and install the 60 metre structure. We’ll keep you updated as work progresses.

Related searches