Australia Free Web Directory

Tom Wade Constructions in Moss Vale, New South Wales | Contractor



Click/Tap
to load big map

Tom Wade Constructions

Locality: Moss Vale, New South Wales

Phone: +61 412 602 850



Address: P.O. Box 887 Moss Vale 2577 Moss Vale, NSW, Australia

Website: www.homeimprovementpages.com.au/connect/tomwadeconstructions/service/175065

Likes: 148

Reviews

Add review



Tags

Click/Tap
to load big map

24.01.2022 Library and Living area: Custom made library with LED strip lighting grooved into the shelving to create a flush finish. Hand painted in Dulux Domino. Engineered oak flooring with underfloor heating, 140mm skirting boards, Custom made pocket doors with 65mm Stile & Rails. Double Glazed external timber windows & doors.



20.01.2022 Progress of our job in Aylmerton with Gyprock and Floor Grinding taking place in preparation of the new Oak Flooring.

19.01.2022 Finished photos of the courtyard on the Job at Exeter

18.01.2022 Some finished photos of the Kitchen, Laundry and Main Bathroom from our job at Exeter



17.01.2022 A few pics from our recently completed Renovation.

17.01.2022 We’ve been busy with this historic house in Bowral. So far we have re-built the verandah and got the new hockey stick rafters installed. Next will be the new galvanised roofing

11.01.2022 Finished photos of the Robertson Build.



10.01.2022 Finished Photos of our Merrigang St Verandah Rebuild. Cypress Tongue & Groove Flooring and Galvinised Bullnose Roofing to stay within Heritage Guidelines

10.01.2022 Bathroom & Kitchen Inspiration from our build at Robertson last year

07.01.2022 Last stage of the Exeter project. The Courtyard Works consisted of raised brick garden beds, porcelain 600 x 600 pavers, timber fencing with steel gates, painting then planting

03.01.2022 Another busy day with Tile & Stone selections up in Sydney today for one of our Builds.

03.01.2022 When you have Decks as good as these, they are the perfect place to entertain during those summer evenings.



03.01.2022 A Perfect job for a rainy day! Adding some class by adding a Chair Rail and some Bollection Mouldings. The bottom section will be finished in a White Gloss

Related searches