TRS Australia in Bendigo, Victoria | Agricultural cooperative
TRS Australia
Locality: Bendigo, Victoria
Reviews
to load big map
24.01.2022 Saves $$$$ on annual electricity consumption to heat water. We estimate in excess of 50% savings and for a large dairy this could be in excess of $4,000 annually. As the TRS system has a direct effect on the milk cooling system during the process of heating water, the refrigeration plant runs more efficiently, therefore reducing running costs. Retro-fits into existing milk cooling equipment.... No need to replace an existing hot water service. As the TRS system is modular the installation time is kept to a minimum. No ongoing costs except in areas of poor water quality where a filter may be required. The system is controlled automatically therefore doesnt require any input by the dairy operator/s. The TRS system is also designed to be solar compatible and the collectors can be retro fitted at a later date.
16.01.2022 In June the DEPI Dairy Research Farm at Ellinbank installed a TRS system including a 2000 litre Stainless Steel buffer tank. This system will be monitored and results posted at a later date.
15.01.2022 A new FCA chiller ready for delivery with a 45 kW TRS heat recovery module. Factory fitted and ready to go.
13.01.2022 Power Expo for Farmers 10.30am 28th March 2018 McIntosh Centre - Shepparton Showgrounds. Come along and discover how a TRS Heat Recovery System can save you up to 60% of your electrical costs to heat water in your dairy. Many other exhibitors will also be in attendance offering advice and technical information on a wide range of alternative energy production.
10.01.2022 We now have a new range of buffer tanks manufactured in Vitreous enamel with an insulated vinyl exterior wrapping. These tanks have fantastic thermal properties and come complete with sacrificial anodes. They are used extensively throughout Europe in both Industrial and Agricultural applications. We will stock sizes from 800 to 2500 litres. We are offering special deals for the month of August on tanks and heat recovery modules and as we move towards the hotter months of the... year, when your refrigeration plants work harder, now is the time to install a TRS system and save around 50% on your energy costs for hot water. No risk enquiry and a no obligation free quote, message us here or through or website www.thermalrecoverysystems.com.au We look forward to meeting you soon.
10.01.2022 How much of your energy costs are taken up heating water. This graph is of a typical non-irrigated dairy farm. TRS could reduce this cost by up to 60% with a payback on the equipment costs of around 3 years.
08.01.2022 Get a 10% discount on all orders placed before the 30th of Sept 2017. Conditions apply.
02.01.2022 Gippsland Installations
01.01.2022 200 kW compressor rake producung 1600 litres of 55 deg water every hour. Payback period -- 9 months.
Related searches
- Avon Valley Agistment Centre
Pet service Agricultural cooperative
+61 430 499 563
Gooch Road Mokine, WA, Australia
50 likes
- Hussey & Co.
Businesses Food service distributor Food & drink Farm Agricultural cooperative
+61 3 5978 6313
602 likes
- Ashmore Community Garden Incorporated
Community centre Agricultural cooperative Community garden
Warrawee Street 4214 Ashmore, QLD, Australia
101 likes