Australia Free Web Directory

Under Road Boring Australia in Koolkhan | Business centre



Click/Tap
to load big map

Under Road Boring Australia

Locality: Koolkhan

Phone: +61 418 610 184



Address: 8 Tee Jay Terrace 2460 Koolkhan, NSW, Australia

Website: http://www.underroadboringaustralia.com

Likes: 125

Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 50m of 300mm on Grade for Shoalhaven Council



23.01.2022 48m of 500mm Steel Case for a 280mm Gravity sewer main completed for Coffs Harbour Council

23.01.2022 Congratulations Tahlia! 3rd in the world. Not a bad effort at all!

22.01.2022 How is your Sunday going? URBA are currently installing 38m of Humes 1800 Butt Joint Jacking Pipe under Queensland Rail Corridor as part of the Chinchilla Open Level Crossing project.



22.01.2022 Just completed a 40m 450 Auger Bore on grade for Shadforths. Encounted some water charged sand just to make things interesting

21.01.2022 We are currently working for HL Mullanes on a 450mm Auger Bore for Stormwater - Strict work times and high level of pedestrian traffic due to the location

20.01.2022 MICROTUNNELLING|AUGER BORING|DIRECTIONAL DRILLING When precision is required and there is no room for error, URBA have a number of custom built, laser guided Microtunnelling Machines. These machines are capable of boring from 500mm 2400mm in diameter. URBA’s machines are able to bore in a variety of ground conditions, utilising ‘vacuum extraction’ of spoil. URBA have a custom built cleaning system which enables for the cleaning of drilling fluid during the boring proc...ess. Once in the Vacuum tank, any excess water is drained, cleaned and re-used using our mud cleaning system which is based at the top of the bore pit. All dirt remains within the Vacuum tank and is removed to a designated site. The Vacuum Tank and Generator are mounted on our Tri Axle trailer and Prime Mover. The generator and vacuum unit are in a silenced canopy, mounted on the trailer. This makes the entire boring process much cleaner and environmentally friendly. OPERATING NATION WIDE Glen Donovan Phone - 0418 664 331 Email - [email protected] Michael Austin Phone - 0418 610 184 Email - [email protected]



20.01.2022 Bit of ablast from the past A few bores which were completed by company director, Glen Donovan, back in the late 80's, early 90's

20.01.2022 We are currently completing 2 x 450 Auger Bores on grade under the Monaro Hwy for FB Contracting.

18.01.2022 New front gate sign Thanks Joel Batto and Troy Designs Awesome!!

18.01.2022 8m of 1050 left to go of the 3rd and final bore for the Open Level Crossing Project. Working over the weekend to complete the bore during a Queensland Rail Shutdown.

18.01.2022 Our Custom made Mud Processing Plant in action during a 100m drive of 1350 Humes Butt Joint Jacking Pipe as part of the Open Level Crossing Project



18.01.2022 Back into it early with 48m of 700mm Auger Bore in rock for Shoalhaven Water. Currently 24m in

17.01.2022 Nowra bound for the last bore of the year. 48m of 500mm for a Gas Main

16.01.2022 750mm Stormwater Auger Bore completed during a ARTC shutdown in Mudgee

16.01.2022 Last minute check before our 500 Laser Guided TBM hits the road to Tamworth

16.01.2022 From Pipe Jacking in Chinchilla QLD to Auger Boring in Ulladulla NSW within a 5 day turn around - URBA have just completed a quick 27m of 600mm for Shoalhaven Water.

15.01.2022 700mm Auger Bore for a 450 DICL watermain - Toowoomba Regional Council

15.01.2022 Currently completing 2 Auger Bores for KCE under the New England Hwy. One down, one to go

14.01.2022 Bit of rock boring on grade for our Wednesday morning

13.01.2022 Working in sunny Mayfield for HL Mullanes. 40m of 400mm

13.01.2022 Another 300mm Grade Auger bore for Ledonne's. Just a tad deeper this time

13.01.2022 Boring holes 500m from our yard not travelling the country for a change. Twin 1050 Stormwater crossing for Garrard Constructions

12.01.2022 MICROTUNNELLING|AUGER BORING|DIRECTIONAL DRILLING Under Road Boring Australia has a number of Case Boring Boring Machines capable of boring horizontally through the soil to hard rock via a steel casing with Auger and cutting head. These machines are used to bore casings under a number of different obstacles including, roads, creeks, railways or any other ground that cannot be open cut. Case Boring offers a safe, quick and efficient alternative to other forms of boring. UR...BA’s Case Boring Machines are able to Bore holes from 300mm 1200mm in diameter depending on ground conditions. URBA have designed and built a number of different cutting heads ranging from Clay Heads up to Rock heads with rotating teeth for the removal of rock. All equipment is designed and built within our workshop using our team of qualified boiler makers. At the start of the bore, the machine needs to be placed near the invert level of the pipeline to be bored. The length and width are pre-determined and discussed depending on room around the site where the bore is to take place. The machine bores through the ground at the required height / grade and soil is removed from the front of the steel casing via the Auger. The soil then travels down the casing and exits via the side of the Case Boring Machine. Upon completion of the bore, the Augers can be removed without the excavation of an exit pit. This minimises disruption to pedestrians and or traffic. The casing is left in the ground for the carrier pipe to be jacked into place. Upon request, URBA are able to ‘jack’ the carrier pipe using staff who are qualified pipe layers and grout the bore. OPERATING NATION WIDE Glen Donovan Phone - 0418 664 331 Email - [email protected] Michael Austin Phone - 0418 610 184 Email - [email protected]

12.01.2022 Spent a few days in wine country last week and knocked over 2 x 400mm Auger Bores for Thompson's Irrifab

11.01.2022 Had a change of plans for the bore at Tamworth. Due to ground conditions, we decided to complete the bore utilising our Auger Boring Machine instead of Micro Tunnelling. Challenging ground conditions consisting of large basalt floaters, hard and soft shale and sticky clay were all encounted during the bore

11.01.2022 Lending a hand to Rodda Haulage over the past few days. Wide load from Brisbane to Glenugie

11.01.2022 UNDER ROAD BORING AUSTRALIA AUGER BORING: 50m 400mm Gravity Sewer - Newcastle NSW... We pride ourselves on maintaining our traditional values & standing out from the world of faceless Corporations.

10.01.2022 4 x 13hr days and the first of 3 bores is through. 36m of 1800

09.01.2022 24m of 1200 J series Jacking Pipe installed under the Pacific Hwy, Maclean. Bore is one of 8 completed. End survey had the bore within 5mm of line and grade.

07.01.2022 40m 3 cell 800mm J Series Jacking pipe installed for Golding Contractors.

06.01.2022 Last week we shot down to Cameron Park for KCE. 400mm Steel case installed on grade. We also supplied our own custom made centralising spacers, installed the PVC carrier pipe and grouted the bore

06.01.2022 51m down, 80m to go! URBA have under taken a contract to complete 130m Gravity Sewer bore utilising our 500mm Laser Guided Micro Tunnelling Machine for Shadforth Civil in Nerangba QLD

05.01.2022 Currently completing a 54m Auger Bore of 400mm Steel Case on Grade for Shadforths. Hopefully this rain holds off for another day

05.01.2022 MICROTUNNELLING|AUGER BORING|DIRECTIONAL DRILLING We still see this industry as one that values a handshake and hard effort, sticking to our roots as an approachable company performing at the highest standard for each client. Our customers value our distinctly family approach to business, working tirelessly to make things right.... When you look at our history, you can tell that the soil of this land is in our blood, something we take great pride in and incorporate into our business. We pride ourselves on having a Director respond to every enquiry, ensuring the fastest & most accurate solution to your Boring needs. OPERATING NATION WIDE Glen Donovan Phone - 0418 664 331 Email - [email protected] Michael Austin Phone - 0418 610 184 Email - [email protected]

05.01.2022 OUR STORY We still see this industry as one that values a handshake and hard effort, sticking to our roots as an approachable company competing in a world of faceless Corperations. Our customers value our distinctly family approach to business, working tirelessly to make things right. ... When you look at our history, you can tell that the soil of this land is in our blood, something we take great pride in and incorporate into our business. Established in 1982 in Grafton NSW , Under Road Boring PTY LTD started boring using custom built boring machines, which were designed and built in house. In the early 80’s, URB completed numerous road, creek and driveway crossings utilising these machines for a number of different customers. In the late 80’s URB won a contract within the Grafton region to install a number of stormwater crossings using RCJP. At this time, URB designed and manufactured its very first Mirco Tunnelling Machine and completed the contract on time and budget. At the completion this contract, and testing of the method, a number of other machines were custom designed and built for numerous contracts Australia wide. In 2016, Under Road Boring Australia PTY LTD was formed, with all employees still with the company. URBA is still family owned with the Founding Director of URB still having a hands on approach to all design and fabrication of machines along with working on the ground completing contracts.

05.01.2022 UNDER ROAD BORING AUSTRALIA AUGER BORING: 42m 700mm Case Bore - Tamworth Regional Council.... We Pride ourselves on maintaining our traditional Values & standing out from the world of faceless corporations.

04.01.2022 Tyson St Another close one to home 300mm Gravity Sewer

04.01.2022 UNDER ROAD BORING AUSTRALIA AUGER BORING: 5 X Case Bores 42m 600mm, 500mm, 400mm - Huntlee (Water Mains)... We pride ourselves on maintaining our traditional values & standing out from the world of faceless corporations.

04.01.2022 New Crane has arrived. Time for trailer modifications before fitting the big girl!

02.01.2022 Quick trip to Long Flat for a 300mm Gravity Sewer shot for Ledonne Constructions

02.01.2022 Quick day trip for a 300mm Auger Bore on Grade in sand for Bashforths

01.01.2022 Bit fresh in Bathurst tonight!

01.01.2022 40m of 1100 J series Jacking Pipe installed for Ledonne Constructions. Pipeline is part of the new Grafton Bridge project

01.01.2022 Welcome to the family! Thought I'd better get a few pictures while it is still clean

Related searches