Australia Free Web Directory

Universal Drafting Pty Ltd | Company



Click/Tap
to load big map

Universal Drafting Pty Ltd

Phone: (08) 9344 1617



Reviews

Add review



Tags

Click/Tap
to load big map

25.01.2022 Here is Prime Minister Scott Morrison and Senator Mathias Cormann checking out our steelwork. I didn't know I was going to meet the Prime Minister of Australia when I woke up yesterday!



25.01.2022 Augusta Boat Harbour pavilion frame being lifted into position. Check out those curves.

25.01.2022 Staff Christmas Party 2014

24.01.2022 One of our projects going up at 999 Hay Street. You can see it when you drive past on the freeway. It is supposedly going to have LED lighting added for night time effects. This photo was taken with a radio controlled drone!



24.01.2022 Before and after pictures of the new ship surface treatment facility.

23.01.2022 Progress photo showing the Gruyere Project Leach and CIL tanks under construction. You can see the automatic welder (blue) working around the bottom right hand tank.

22.01.2022 Just been contacted by my client who we drew the new iFly skydiving centre for. Free flights for Universal Drafting tomorrow morning! Yessssss!



21.01.2022 And if you look at the previous photo, you can see my calculator on the desk. I still use it today. It is called "The Death Adder".

20.01.2022 Because of the size of the Brookfield Place Footbridge, it has to have special escorts, road closures and can only go a specific route. Check out the extended route from Landsdale to Mounts Bay Road! 33KPH and 6 hours :)

18.01.2022 Ok to all my clients with cranes. Can we do something like this please.

18.01.2022 Im a nerd so I laughed.

18.01.2022 Now this goes back many years! I would guess 1989? Not bad. 4 years out of school and already self employed!



16.01.2022 This is one of our next projects. It will be on the corner of Hay Street and Elder Street. I think people will either love it or hate it. I know I will enjoy drawing it!

16.01.2022 So our team took to the skies today and I am pleased to say it all worked like it was supposed to. I think we may have been used as tester guinea pigs! Of course I never doubted it would work seeing as we drew the whole thing :)

16.01.2022 Augusta Boat Harbour amenities block.

15.01.2022 One of our recent projects is the Fitz Stirling Station where our brave firefighters sleep/rest/wait in between fighting our enormous West Australian bush fires. Enjoy brave people!

14.01.2022 Our Indoor Skydiving facility has just opened in time for Christmas! Can't wait to give it a go! https://www.youtube.com/watch?v=4yyfigXuGpM&feature=youtu.be

13.01.2022 More progress on the low level structure of the Ship Assembly Hall. On the right is the Surface Treatment Facility. The next stage will be to build a building the size of the Surface Treatment Facility within the Ship Assembly Hall. Then, once it is fully completed, we are going to jack it up to sit above the low level structure. Awesome team producing awesome engineering!

12.01.2022 Here is another before and after shot of one of our older projects albeit with a time lapse in between photos. Who knows the location?

09.01.2022 Now that the Myer and malls have opened at Lakeside Joondalup, you wouldn't recognise where construction was a few months ago. Here is a snapshot looking at the lift near the Myer Entry.

08.01.2022 This is the project that we have been working on for over a year now. Great building. Click on the link!

08.01.2022 More photos of the Brookfield Place Footbridge. 60 tonnes with the glazing and cladding on! Unfortunately there were some technical problems on Saturday so the bridge wasn't able to be transported. It will now be rescheduled for some time in June.

07.01.2022 This is our 33m pedestrian bridge that will be installed over Mounts Bay Road from Brookfield Tower to Ernst & Young Plaza. The entire 60 tonne structure will be clad, glazed and trucked to site in one piece and lifted into position. I will follow up with some photos of the transport and installation once they complete it.

07.01.2022 Finally made it to Lakeside yesterday to check out our handywork. Here is a before and after photo of the lift shaft in the Myer node.

06.01.2022 Our latest project. https://www.perthnow.com.au//civmec-starts-construction-on

06.01.2022 This is one of our senior draftsmen relaxing at home on the weekends where he is single handed building an aircraft hangar! Of course he had good drawings to work from!

06.01.2022 Here is a sneak peek of what's happening around the horse shoe bridge in Perth! Love the look of Yagan Square! We already drew the State Theatre and already extended the roof of the adjacent train station so now I want to win this project next!

05.01.2022 Not sure if you can appreciate the scale of this footbridge. I have a snapshot from our model showing it in position spanning from Brookfield Plaza to Ernst & Young Plaza. And I also have some photos of the truss in the workshop and you can see some boilermakers which show the size. Did I mention it's big :) At each end we are bolting a 4 tonne, 5 metre tall "book end" which gets fitted to a truck bogey. It will take 6 hours to get from Landsdale to Perth as it has to go via Midland to avoid bridges etc.

05.01.2022 And here is the beginnings of Australia's biggest ship fabrication building. It will make the ship surface treatment facility look like a garden shed.

04.01.2022 Coming soon to Perth! Here is our latest project that we are currently working on. Who is game enough to give this a go?

04.01.2022 Another day and just another award...... Special mention to Russell Osborne who modelled most of the steelwork!

03.01.2022 We've moved our office! We're back in our old office at 4/187 Main Street, Osborne Park. And our number has changed too. (08) 9344 1617. It's good to be back :)

03.01.2022 And here is a before and after view down the fashion link mall.

03.01.2022 After much drama and an epic road trip, here is the Brookfield Place Pedestrian Bridge in its final position.

03.01.2022 More photos. I was pretty impressed with the final finish!

03.01.2022 Interesting photo of a new development we're doing on Beaufort Street showing how it looked in 1914, how it currently looks and what it will look like soon.

02.01.2022 Some large storage tanks we drew for the Gruyere Gold project. They are currently only half complete so will be twice as high!

02.01.2022 Having a well deserved Christmas beer last year with some of the Lakeside design team.

01.01.2022 Who knew how much she appreciates draftsmen!

Related searches